Page 97 - Critical Control flipbook_Neat
P. 97
Falling from Height
1 What is the name of the 2 What are its specific objectives related to the Priority Unwanted
Event (PUE)?
critical control for Falling
from Height?
Certified Work Access Equipment Certified structures, platforms, and work access equipment (eg. MEWP, scaffold) are
designed, set-up and used properly when performing work at heights tasks
3 What are the critical 4 What are the activities 5 What can be sampled from
control performance
within the management
the set of activities for
requirements to meet the systems that support verification, providing a
objectives? having the critical control clear image of the critical
able to do what is required? control status?
The physical requirements including size, Equipment certification program and Equipment certification records
strength, materials and markings (tags/ pre-use inspection program are in place (including capacity/load ratings on
labels) are adequate equipment) and appropriate markings
on all equipment such as stickers, tags,
plaques, or labels indicating material
adequacy
Safe usage requirements including Permit to work program and pre-task Signed (authorized) permit to work and a
position, set-up, distance from edges, (field level) risk assessment program pre-task (field level) risk assessment
signage, and speed/area of movement
The inspection and maintenance Inspection and maintenance program for Annual inspection records from
requirements are done annually and all the equipment in use; both annual and authorized inspector (qualified) and pre-
before each use pre-use use inspection records
Assembly, inspection and use of the Training program and authorized person Training matrix and training records
equipment is only by those who are requirements
authorized
6 What is the target performance for critical 7 What is the critical control performance
trigger for shutdown, critical control review or
control?
investigation?
Only equipment that is fit for purpose, fit for use and has been Any equipment or part of a structure, platform, or work access
fully authorized in advance is used for working at height tasks system that is not fit for use OR not authorized
Creation date: 01/2021 • The latest and only controlled version of this document is available on the HSE intranet.