Page 131 - Critical Control flipbook_Neat
P. 131

Water Pollution

                                                 Discharge










           1     What is the name of the      2    What are its specific objectives related to the Priority Unwanted
                 critical control for Water
                                                   Event (PUE)?
                 Pollution Discharge?
          Discharge monitoring               Procedures for sampling and monitoring discharges ensures compliance to limits and
                                             detects opportunities for improvement


           3     What are the critical        4     What are the activities      5     What can be sampled from
                 control performance
                                                    within the management
                                                                                       the set of activities for
                 requirements to meet the           systems that support               verification, providing a
                 objectives?                        having the critical control        clear image of the critical
                                                    able to do what is required?       control status?
          Discharge parameters subject to    Ensure the sampling and monitoring   Record of permit requirements and
          regulatory, consent and/or group limits   program is included in the annual review   consent requirements, ensure permit is
          are measured using certified sampling   of the water management program  not expired or suspended
          and analytical methodologies
                                             Procedures for the sampling and    Record of  sampling and monitoring
                                             monitoring program are in place    program ensure methodologies are
                                             (e.g. monitoring points, periodicity,   specific to parameters  (i.e. pH, TDS,
                                             methodologies for analysis)        metals) required by regulation and/or
                                                                                group limits
                                                                                Records of sampling /monitoring
                                                                                records, check periodicity against
                                                                                program schedule

          Data & documentary evidence is kept   Annual review of records and key   List of key documents and records are
          and available for review for five years at   documents. Quarterly review of   accessible and readable
          minimum                            environmental incidents
                                             Corrective action plans to address
                                             deviations


           6     What is the target performance for critical    7    What is the critical control performance
                 control?
                                                                     trigger for shutdown, critical control review or
                                                                     investigation?

          Procedures for sampling and monitoring are established and   Fines, penalties or violations due to sampling and/or monitoring
          followed, and records are kept


























          Creation date: 01/2022 • The latest and only controlled version of this document is available on the HSE intranet.
          © 2022 Holcim - For internal use only
   126   127   128   129   130   131   132   133   134   135