Page 133 - Critical Control flipbook_Neat
P. 133

Water Pollution

                                                 Discharge










           1     What is the name of the      2    What are its specific objectives related to the Priority Unwanted
                 critical control for Water
                                                   Event (PUE)?
                 Pollution Discharge?
          Treatment system                   Treatment systems avoid exceedances of polluted water discharges


           3     What are the critical        4     What are the activities      5     What can be sampled from
                                                                                       the set of activities for
                 control performance
                                                    within the management
                 requirements to meet the           systems that support               verification, providing a
                 objectives?                        having the critical control        clear image of the critical
                                                    able to do what is required?       control status?
          Treatment system is designed and   Procedures are in place to address   Record of regulatory permit and
          operated to meet water quality and   any deviations from operating limits    requirements and check to see if they are
          quantity parameters (e.g. TDS, pH,   (e.g. influent flow rate, settling times,   considered in treatment schemes
          temperature) based on regulatory,   discharge rate) to ensure system meets   Discharge records are within operating
          permits, consents and/or group limits  quality/quantity limits preventing   limits
                                             discharge exceedances              Site observation, check for controls
                                             Major changes impacting treatment   to handle peak volume loads from
                                             systems are assessed ahead of time   production or rain events (e.g. alarms,
                                             to verify that system can still meet   diversion system, spillover pond,
                                             discharge limits                   emergency basin)
                                                                                Record from Review Management of
                                                                                Change (MoC) of last major change
                                                                                and check if treatment methodology
                                                                                considered . Verify discharge parameters
                                                                                before and after changes

          Water treatment equipment is regularly   Preventive maintenance and inspection   Record of critical equipment identified
          inspected and maintained           schedules of critical equipment are   and periodicity of inspections, PMs
                                             executed following manufacturers   recorded, check last inspection
                                             instructions                       performed
                                             Routine maintenance on other       Record of last structural inspection and
                                             components for treatment system    corrective actions
                                             identified and scheduled           Incidents and findings related to
                                             Inspections to include visual and   discharge exceedances, note if cause was
                                             non-destructive testing on structure   due to equipment failure
                                             of treatment system for containment
                                             (slopes, erosion, cracks)


           6     What is the target performance for critical    7    What is the critical control performance
                 control?
                                                                     trigger for shutdown, critical control review or
                                                                     investigation?
          Water treatment system is able to keep discharges within   Exceedances against regulation, permits, consents and/or group
          regulatory, permits, consents and/or group limits    limits
















          Creation date: 01/2022 • The latest and only controlled version of this document is available on the HSE intranet.