Page 51 - Critical Control flipbook_Neat
P. 51

Material Engulfment











           1    What is the name of the       2    What are its specific objectives related to the Priority Unwanted
                critical control for Material
                                                   Event (PUE)?
                Engulfment?
          Only Work Above Material Level     If material storage/transfer space must be entered as absolute last resort, then entrants
                                             remain above material level


           3    What are the critical         4    What are the activities       5    What can be sampled from
                                                   within the management
                control performance
                                                                                      the set of activities for
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          Material level and location are known   Technology or approved method used to   Inspection record review for past entries
          prior to entry                     confirm material level / location before   Project Plan (for silo cleaning)
                                             entering the space and recorded in
                                             formal pre-entry inspection
                                             Part of Project Plan (for silo cleaning)

          Cleaning work/access is done from the   Risk assessment, SOP and permit-to-work   Review of risk assessment, SOP and
          top down. If standing on material is   for the top-down entry created   permit to work being available and used
          required, cavities eliminated and a flat/  Part of Project Plan (for silo cleaning)  Project Plan (for silo cleaning)
          covered surface prepared

          Equipment used is certified and suitable   Defined requirements for the equipment   Review of record of certification and
          for entrants to work from top down   being used and accessibility to this   equipment specifications
          without risk of falling or engulfment  equipment (work access, fall protection   Project Plan (for silo cleaning)
                                             systems, etc.)
                                             Part of Project Plan (for silo cleaning)

          Entrants to the material storage/transfer   Authorization process for entering into   Review process and authorized samples
          space are trained and certified and   material storage/transfer spaces defined   from work completed
          work is authorized by permit-to-work in   and procedure created       Project Plan (for silo cleaning)
          advance                            Part of Project Plan (for silo cleaning)



           6    What is the target performance for critical     7    What is the critical control performance
                                                                     trigger for shutdown, critical control review or
                control?
                                                                     investigation?
          Entry only completed with entrant above level of material   Entry into space with entrant below material level or not
          (if material present)                                authorized entry
          For silo cleaning, Project Plan is authorized and signed off by   Lack of formal Project Plan for silo cleaning activity
          Plant Manager’s N+1