Liquid Fuel Fire











           1    What is the name of the       2    What are its specific objectives related to the Priority Unwanted
                                                   Event (PUE)?
                critical control for Liquid
                Fuel Fire?
          Explosion Mitigation and Firefighting  Having an adequately designed explosion prevention and mitigation system with fire
                                             fighting capabilities to limit the extent of the damage and further propagation


           3    What are the critical         4    What are the activities       5    What can be sampled from
                control performance
                                                                                      the set of activities for
                                                   within the management
                requirements to meet the           systems that support               verification, providing a
                objectives?                        having the critical control        clear image of the critical
                                                   able to do what is required?       control status?
          Low flash point fuels - storage tank   Scheduled preventative maintenance   Flame arrester maintenance records for
          vents have a certified flame arrester.   and inspection routine in CMMS as per   defects
          Flame arrester maintained as per the   manufacturer’s requirements / Corporate
          manufacturer’s recommendation      CEM guidance

          Vents directed to non hazardous areas,   Occupied buildings are identified,   Field verification of vents directed
          away from occupied buildings or    ventilation drawings with air intakes  towards occupied buildings or air intakes
          personnel access areas

          Fully developed automatic fire detection  Fire detection and fire risk management   Fire detectors types, positions and
                                             process, risk assessments, and documents  locations
                                             AFR Fire Protection manual
                                             Maintenance and testing of fire detection
                                             systems are in CMMS
          Low flash point fuels - Automatic fire   AFR Fire Protection manual   Required capacity and pressure vs actual
          fighting                           Maintenance and testing of fire fighting   Fixed foam fire fighting installation for
          a. Automatic detection             systems are in CMMS                low flash point fuels with fully automatic
          b. Manual push button activation                                      detection and activation
          c. Activate firefighting system (foam)
          d. Adequate pumping capacity
          *Applicable to storage over 10m3 or 10,000L
          Regular inspection, testing and    Scheduled inspection, testing      Percentage of inspection or PM
          maintenance of fire fighting system   and maintenance in CMMS as per   completion rate
                                             international codes such as NFPA   Number of defects found during
                                             Annual performance testing (Flow &   inspection and PMs. (This should be
                                             Pressure)                          documented in CMMS)
          All the fuel systems are equipotential   Site lightning protection system  Number of defects found during earth
          bonded/earthed/grounded with       Site earthing/equipotential bonding   impedence testing (CMMS)
          adequate lightning protection      drawings                           Required impedence values vs actual
                                             Earth impedence testing in CMMS

           6    What is the target performance for critical     7    What is the critical control performance
                control?
                                                                     trigger for shutdown, critical control review or
                                                                     investigation?
          Both explosion protection and fire fighting system to be   Failed/inadequate Certified Equipment during Inspection.
          adequately sized and designed according to standards. All the   Unauthorised deferment of inspection or maintenance without
          inspection, maintenance and testings are carried out as per ISO/  Plant Manager’s written authorisation
          EN 14491 Standard and NFPA