Page 178 - ENGLISH PR REPORT FEBRUARY 2024_Neat
P. 178
2/26/24, 11:06 AM Dubai Municipality initiates project to develop Dubai Creek pier and upgrade support walls : GoDubai.com
• “Over 13,000 ships cross Dubai Creek annually”
Dubai, UAE, February 25, 2024
Dubai Municipality has implemented a project to rebuild and rehabilitate the supporting walls
along the Deira side of Dubai Creek, with a total expense of AED 112 million. The project aims
to enhance the effectiveness of the creek's retaining walls by upgrading the dock,
reconstructing sections that have been damaged and dilapidated over the past 50 years, and
preventing potential flooding during harsh weather conditions. This effort aims to minimize
disruptions to commercial traffic caused by flooding or bad weather.
The project is set to be implemented in two phases, with the initial phase involving the
restoration of a 2.1 km stretch along the Deira side of Dubai Creek. The site will be divided
into multiple sections, and each segment will be sequentially patterned to ensure
uninterrupted docking traffic. The second phase will cover a 2.3 km length on the Bur Dubai
side.
Global Reputation
H.E. Dawoud Al Hajri, Director General of Dubai Municipality, stated that the project highlights
Dubai Municipality's commitment to transforming Dubai into a more attractive and innovative
city by enhancing various elements and services it offers through the strategic and
sustainable development of all coastal facilities and infrastructure in the Emirate. The goal is
to solidify Dubai's position as a global tourism hub and augment its economic and commercial
prosperity.
Al Hajri said: “The project is set to improve security and safety measures for maritime traffic
and commercial operations within Dubai Creek. As a significant symbol of the city's growth,
Dubai Creek serves as a vibrant artery at the heart of Dubai. Facilitating the passage of over
13,000 ships annually, it plays a key role in fostering the economic and social prosperity of the
emirate. Additionally, the creek further supports commercial dealings with neighboring
markets in the region.”
“We have implemented several measures to mitigate the risks posed by climate change and
rising sea levels, closely monitoring changes on both sides of the creek. Furthermore, we
have conducted technical studies to devise construction designs that can enhance the
efficiency of the marine docks on both banks. These designs adhere to the highest global
standards, ensuring the preservation of the supporting walls' stability and safeguarding
against increased flooding during seasonal weather conditions.” Al Hajri added.
Comprehensive work
The project's 14-month timeline includes the restoration of the 2.1 km Deira pier, which
involves replacement and the rehabilitation of damaged sections of the concrete wall,
reaching a depth of 8 meters and increasing its height to 3 meters. These improvements aim
to ensure the safe docking of ships in the area.
By initiating this project, the Municipality aims to enhance services and facilities for safe
docking and navigation, which will be ensured through the provision of 200 anchors across
the dock.
Dubai Creek is one of the most vital historic maritime channels in the Emirate, marking the
initiation of Dubai's trade interactions with the world over a century ago. Despite the extensive
development in the Emirate of Dubai, the Creek continues to maintain its historical,
https://www.godubai.com/citylife/press_release_page.asp?pr=177627&search= 2/3