Page 236 - ENGLISH PR REPORT FEBRUARY 2024_Neat
P. 236
The project is set to be implemented in two phases, with the initial phase involving the
restoration of a 2.1 km stretch along the Deira side of Dubai Creek. The site will be
divided into multiple sections, and each segment will be sequentially patterned to
ensure uninterrupted docking traffic. The second phase will cover a 2.3 km length on
the Bur Dubai side.
Global Reputation
Dawoud Al Hajri, Director-General of Dubai Municipality, stated that the project
highlights Dubai Municipality’s commitment to transforming Dubai into a more attractive
and innovative city by enhancing various elements and services it offers through the
strategic and sustainable development of all coastal facilities and infrastructure in the
Emirate. The goal is to solidify Dubai’s position as a global tourism hub and augment its
economic and commercial prosperity.
Al Hajri said, “The project is set to improve security and safety measures for maritime
traffic and commercial operations within Dubai Creek. As a significant symbol of the
city’s growth, Dubai Creek serves as a vibrant artery at the heart of Dubai.
Facilitating the passage of over 13,000 ships annually, it plays a key role in fostering the
economic and social prosperity of the emirate. Additionally, the creek further supports
commercial dealings with neighbouring markets in the region.”
“We have implemented several measures to mitigate the risks posed by climate change
and rising sea levels, closely monitoring changes on both sides of the creek.
Furthermore, we have conducted technical studies to devise construction designs that
can enhance the efficiency of the marine docks on both banks.
These designs adhere to the highest global standards, ensuring the preservation of the
supporting walls’ stability and safeguarding against increased flooding during seasonal
weather conditions.” Al Hajri added.
Comprehensive work
The project's 14-month timeline includes the restoration of the 2.1 km Deira pier, which
involves replacement and the rehabilitation of damaged sections of the concrete wall,
reaching a depth of 8 meters and increasing its height to 3 meters. These improvements
aim to ensure the safe docking of ships in the area.
By initiating this project, the Municipality aims to enhance services and facilities for safe
docking and navigation, which will be ensured through the provision of 200 anchors
across the dock.
Dubai Creek is one of the most vital historic maritime channels in the Emirate, marking
the initiation of Dubai’s trade interactions with the world over a century ago.
Despite the extensive development in the Emirate of Dubai, the Creek continues to
maintain its historical, commercial, and economic importance, along with modern
projects prevalent in the emirate, in addition to serving as a significant tourist hub for
residents, visitors, and tourists.
https://www.msn.com/en-ae/news/other/dubai-municipality-initiates-project-to-develop-dubai-creek-
pier-upgrade-support-walls/ar-BB1iQuhW