Page 444 - DUBAI MUNICIPALITY ENGLISH PR REPORT JUNE 2024
P. 444
Dubai: New floating pedestrian
bridge announced as 2 beaches
to be revamped
The public beaches will remain partially closed while being developed in a project
that is expected to take 18 months to complete
Photo: Supplied
Published: Mon 3 Jun 2024, 12:54 PM
Last updated: Tue 4 Jun 2024, 9:14 AM
A floating bridge will link the two sides of Al Mamzar Beach, it was announced on
Monday (June 3). The 200-metre pedestrian bridge will be the first of its kind in Dubai. A
floating bridge is built right over the water surface, allowing visitors to venture deep over
a water body without getting wet.
This came as the urban planning committee in Dubai awarded contracts to develop two
of its most popular stretches of beaches: Al Mamzar and Jumeirah 1. The public
beaches will remain partially closed as they are developed. The parts that are open will
see safety measures implemented to protect users.
https://www.khaleejtimes.com/uae/dubai-announces-new-floating-pedestrian-bridge-over-al-
mamzar-beach