Page 444 - DUBAI MUNICIPALITY ENGLISH PR REPORT JUNE 2024
P. 444

Dubai: New floating pedestrian


               bridge announced as 2 beaches



               to be revamped



               The public beaches will remain partially closed while being developed in a project
               that is expected to take 18 months to complete


































               Photo: Supplied

               Published: Mon 3 Jun 2024, 12:54 PM
               Last updated: Tue 4 Jun 2024, 9:14 AM

               A floating bridge will link the two sides of Al Mamzar Beach, it was announced on

               Monday (June 3). The 200-metre pedestrian bridge will be the first of its kind in Dubai. A
               floating bridge is built right over the water surface, allowing visitors to venture deep over
               a water body without getting wet.



               This came as the urban planning committee in Dubai awarded contracts to develop two
               of its most popular stretches of beaches: Al Mamzar and Jumeirah 1. The public

               beaches will remain partially closed as they are developed. The parts that are open will
               see safety measures implemented to protect users.

               https://www.khaleejtimes.com/uae/dubai-announces-new-floating-pedestrian-bridge-over-al-
               mamzar-beach
   439   440   441   442   443   444   445   446   447   448   449