Page 13 - DATA CAMPUS
P. 13
DATA CAMPUS
CONSTRUCTION
Examples of Granular MDC’s and their
constructed using only hand battery
operated tools during the assembly
process. There are no wet trades,
cutting or dust, there is no
disturbance to occupiers of other
facilities within the building, or in the
vicinity.
All components are pre made,
high quality, man portable
precision parts. This
simplifies the whole process
of fitting out within the shell
building, as access through
small or difficult access
points poses no problem.
12
T: +44(0)1425 632600 | CANNONTECH.CO.UK | SALES@CANNONTECH.CO.UK