Page 7 - WTR_Newsletter_2019
P. 7

KIPP Lynn High Rock and Wheeler Charter Schools
                                    Lynn, MA


               Project consisted of two phases. Phase 1 included a 12,000 SF
               addition to the existing KIPP Lynn High Rock School. Phase
               2 included a 60,000 SF renovation of an existing building
               (at a different location) to create a new high school facility.






















                                                          King Open/Cambridge Street Upper School
                                                                          Cambridge, MA

                                                        Construction of a new 270,000 SF school and community
                                                        complex.  The project included abatement/demolition of the
                                                        existing school structure.  The new building included over 190
                                                        geothermal wells, a photovoltaic panel system covering the entire
                                                        roof, a highly technologically advanced interior as well as multiple
                                                        energy-efficient, exterior wall systems.  The project is targeting
                                                        LEED  Platinum and  was  designed  around Net  Zero  goals.




























                                              Great work everyone!

                                  W.T. Rich is proud of all our projects.


                                                                                                              6
   2   3   4   5   6   7   8   9   10   11   12