Page 7 - Engineering
P. 7

special watch on the welders having DGR>1.0% is being done to minimize the
               consequences of failures.


               CAUSE WISE ANALYSIS OF FRACTURES                                     (AS on 28.11.2021)






               From the graph it can be seen that 15.15
               %  of  failures  are  due  to  defective  rail  /
               welds  and  27.27%  of  failures  are  due  to
               sudden  rail  /  welds  which  have  been
               identified well in advance by doing USFD
               testing and joggle fish plating the same,
               thereby ensuring maximum safety.




               1.1.5.  SCRAP

               Division has offered 6872 MTs of scrap upto Oct‟21 as against proportionate
               target of 6125 MTs and annual target of 10500 MTs.




















               Note:


                 1.   Release orders for 663.74 MTs of rails for construction are available & yet to be
                     lifted by construction.
   2   3   4   5   6   7   8   9   10   11   12