Page 14 - ELS_KZJ
P. 14

Reliability measures incorporated in Locos( including innovations)

 S
 .   Date of
 N  Equipment   issue   Holding   (Locos)   Locos/ Qty   to be   provided   Provided   up to last   year   Provided   during the   month   Cumu.   during   current   year   Balance   Action plan
 o
 Modification  of  Traction  link  flange  &   24.10.0  Superseded by SMI/259;
 1.   97   97   --   --   --   NIL
 mounting  bolts.(SMI/0241 Rev'0')   6            completed
 Provision  of  safety  slings  to  avoid  falling   08.11.0
 2.  down   of   compressor   unit   on   line   6   97   97   --   --   --   NIL   Completed
 (SMI/0242Rev'0')
 Maintenance of axle box bearings for WAP7   Being followed. Sealed bearings will be
 3.  &  WAG9/  WAG9H  locos.  [SMI/0246  (Rev'1)   26.11.1  97   97   --   --   --   --   replaced with unsealed bearings during
 5
 Dt. 26.11.15                        bearing replacement
                                     Being   followed.   (Intactness   and
 Maintenance   of   earthing   system   22.11.0
 4.   97   97   --   --   --    --   tightness  of  all  earth  shunts  being
 (SMI/0248Rev'0')   7
                                     ensured)
 SMI/0251  (Rev'2')  on  Maintenance  instruction  for  brake  hangers  for
 WAG9/WAG9H locos DT.31.05.18
 (a)Provision  of  double  safety  slings  in  31.05.1  97   37   37   --   --   Nil   Completed
 crosswise arrangement   8
 (b)  DPT  should  be  conducted  at  the
 welding  portion  of  brake  hangers  during  31.05.1  97   37   37   --   --   --   Being followed
 MOH/lifting  of  loco  to  detect  crack   8
 SMI/0251 (Rev'2')
 (c) Ensure provision of FS lock nuts & sealing
 compound for brake hanger top suspension   31.05.1
 5.   97   37   37   --   --    --   Being followed
 threaded  bolt  and  brake  rod  connecting   8
 pin SMI/0251 (Rev'2')
 (d)  Ensure  the  slit  in  the  brake  equipment   31.05.1
 should be in arc of 717 mm radius. SMI/0251   8   97   37   37   --   --   --   Being followed
 (Rev'2')
 (e) Ensure availability of slack adjuster on all   31.05.1  97   37   37   --   --   --   Being ensured
 units SMI/0251 (Rev'2')   8
 (f)  Parallelism  of  brake  hangers  should  be   31.05.1
 checked  using GO-No-Go gauge SMI/0251   8   97   37   37   --   --   --   Being ensured
 (Rev'2')
   9   10   11   12   13   14   15   16   17   18   19