 (g)  Parallelism  and  perpendicularity  of
 brake hangers should ensured at the time of  31.05.1  97   37   37   --   --   --   Being done during IOH
 IOH/POH  or  replacement  of  brake  hangers   8
 on test jig SMI/0251 (Rev'2')
 (h)  Clearance  of  13mm  between  bogie   31.05.1
 frame and brake hanger should be ensured   8   97   37   37   --   --   --   Being followed
 SMI/0251 (Rev'2')
 (i)  Brake  hangers  of  different  makes  and   31.05.1  Ensuring that different make/ design
 designs should not be provided in the same   8   97   37   37   --   --   --   hangers not available in one assembly
 assembly SMI/0251 (Rev'2')
 Air  delivery  measurement  in  three  phase
 loco  to  ascertain  proper  cooling  and   08.05.0  Continuous activity. Being carried out
 6.   97   97   --   --   --    --
 pressurization of machine room   (SMI/0255   9   by PPO in every schedule.
 Rev'0')
 Modified   instructions   on   maintenance
 practices  and use/ replacement of spares/   09.12.0  Continuous activity. Being carried out in
 7.   97   97   --   --   --    --
 material for traction link and housing for 3Ph   9   every schedule.
 locos (SMI/0259 )
 Maintenance  of  Traction  motor  support
 plate  and  bogie  nose  to  prevent  crack/  16.03.1
 8.  breakage  of  traction  motor  support  plate.    6   97   97   --   --   --   NIL   All  TM  back  plates  are  8mm  and
 (Holder  for    Traction  motor  -suspension)  (Rev-1)   above.
 (SMI/0269 )
 16.03.1
 DPT should be conducted on motor support
 9.   6   97   97   --   --   --   --   Being followed as regular activity.
 during TOH/IOH/POH
 (Rev-1)
 16.03.1
 Checking of the condition of Spheribloc’s of
 10.  6   97   97   --   --   --   --   Being followed as regular activity.
 TM support torque arms during all schedules
 (Rev-1)
 Creating  facility/  Measurement  of  axial
 11. wear   of   Spheribloc   before   re-using    17.11.1  97   97   --   --   --   --   Being replaced as must change item in
                                     IOH. Every 4 years.
 1
 (SMI/0270 )
 Special maintenance instruction to prevent
 12. falling  of  Brake  Hanger  in  middle  axles  of   16.09.1  97   60   51   --   09   NIL   Completed.
 4
 WAP-7 locomotives (SMI/282)
 Use  of  induction  heater  for  heating  of  end   08.11.1
 13.  97   97   --   --   --    --   Being followed.