Page 20 - ELS_KZJ
P. 20

S
 .   Date of         month
 N  Equipment   issue   Holding   (Locos)   Locos/ Qty   to be   provided   Provided   up to last   year   Provided   during the   Cumu.   during   current   year   Balance   Action plan
 o
 Rev'0'


 Modification  to  brake  lever  for  WAG9/
 WAG9H  electric  locos  to  improve  reliability   22.12.1
 25.   97   37   --   --   --   --   Under Progress
 & ensure inter change ability  (EL/MS/0455)   6
 Rev’0’
 Modification  in  cooling  circuit  of  M/s  BHEL   BHEL not agreed to supply the material
 IGBT  SR  to  prevent  air  locking,  spillage  of  12.01.1  for  all  locos  and  committed  for
 26.   97   51   --   --   --   51
 coolant  and  fluctuation  in  coolant  level      7   modification   in   case   of   coolant
 (EL/MS/0457) Rev’0’                 fluctuation problem.
 Modification   in   three   phase   electric
 locomotive  provided  with  MICAS  based

 27.  VCUs to ensure complete redundancy FLG-  12.06.1  97   13   13   --   --   NIL   Completed
 7
 1/2  and  STB-1/2  of  processors  cards
 (EL/MS/0459) Rev’0’
 Modification in drawing of bearing cap NDE
 to  achieve  adequate  lateral  thrust  in  TM   12.06.1
 28.   97   97   --   --   --   --   Being followed
 assembly  of  6FRA6068  TM  in  WAG9/  WAP7   7
 locos (EL/MS/0460) Rev’0’
 Provision of Auxiliary Interlock for monitoring
 of  A2-  B2  segment  of  Harmonic  filter  ON  25.09.1
 29.   97   97   49   03   08   40   Under progress.
 (8.1) adoption/ (8.2) Contactor in GTO/IGBT   7
 locos.  (MS/464)
 A)  Trap  Chamber  for  collecting  coal/dust
 particles  coming  from  BP  Train  Pipe  during   97   97   40   --   33   24   Being followed in IC/Major schedule.
 emergency  brake  application.  (MS/465)
 Rev’0’
 30.  B)  Replacing  KBIL  make  'NB-11  Valve'(size   18.10.1
 7
 01")  of  CCB  system  with  FTRTIL  make   Replacing  based  on  location  of  NB11  at
 'Emergency  Exhaust  valve'(size  11/4")  of  E-  97   42   25   --   17   Nil   under  gear,  either  by  lifting  or  by  without
 70  system  or  similar  design  Emergency   lifting, during Major schedules.
 exhaust valve. (MS/465)Rev’0’
 Modification  in  drawing  of  Outer  bearing
 cap DE to  achieve adequate lateral thrust
 31.  in Traction motor (TM) assembly of 6FRA6068   15.11.1  97   97   --   --   --   --   Being followed during overhauling.
 7
 TM   in   WAG9/WAP7   class   of
 locomotives.(MS/466)
   15   16   17   18   19   20   21   22   23