Page 22 - ELS_KZJ
P. 22

S
 .   Date of         month
 N  Equipment   issue   Holding   (Locos)   Locos/ Qty   to be   provided   Provided   up to last   year   Provided   during the   Cumu.   during   current   year   Balance   Action plan
 o
 Reliability  improvement  in  blocking  diodes
 32.  of   three   phase   electric   locomotives.   07.12.1  97   97   88   03   08   01   During TOH same will be completed.
 7
 (MS/467)
 Modification  for  providing  Cab  AC  unit  in   For  locos  fitted  with  AC  trough  but
 33.  Electric  locomotives  by  Zonal  Railways.   08.05.1  97   51   --   --   --   --   without cab AC. Will be carried at POH
 8
 (MS/469)                            /SHOP
 Modification  for  provision  of  LED  type  light
 34.  for  exchanging  signals  with  train  passing   18.06.1  97   46   10   --   --   36   For locos provided with cab AC.
 8
 staff.  (MS/470)
 Modification  in  Hex.  Socket  CSK  Head
 Screws  for  fixing  of  Traction  Motor  Bellow
 plate  to  achieve  adequate  mechanical   20.08.1
 35.   97   97   50   11   32   15   Under Progress
 strength  in  Traction  motor  (TM)  type   8
 6FRA6068   for   WAG9/WAP7   class   of
 Locomotives.  (MS/472)
 Modification  in  existing  Control  Electronics  12.12.1
 36.   97   97   43   03   03   51   Under Progress
 (CE) resetting scheme. (MS/475)   8
 Modification  in  Mounting  arrangement  of
 Leather  Bellows  of  Traction  Motors  type   22.01.1
 37.   97   97   20   --   31   46   Under Progress
 6FRA6068   (MS/0476-Rev’0)(Supersedes   9
 MS/373 & MS/374)
 Modification  in  earth  fault  circuit  for
 elimination of spurious message on account  05.12.1
 38.   97   97   89   03   05   NIL
 of  earthing  of  control  cables  in  3-phase   9
 locomotives. (MS/480)
   17   18   19   20   21   22   23