Page 6 - Electrical (M)
P. 6

c). ACTION PLAN ITEMS (POWER)



                                                                     Actual 2019-       Actual          Actual
                                                           Target
                               Description                                20            2020-21        2021-22
                                                          2021-22
                                                                      (Apr-Oct)        (Apr-Oct)      (Apr-Oct)
             1     Energy consumption in MU                              15.08           12.04           13.24
                   (w.r.t Last year)   (-5%)               26.30      (Apr-Sep)        (Apr-Sep)      (Apr-Sep)
             2     Provision of sanctioned Escalators        4             0               0               2

             3     Provision of sanctioned Lifts             11            5               0               2

             4     Energy auditing of major load             2             7               0               1
                   centres and pumping installations
             5     Green Co. rating for office/station
                   buildings (ensure electrical              1             -               0               1
                   compliance)
             6     Use of solar panels for manned LC
                   gates                                     5             2               2               0
             7     New/Replacement of
                   conventional geysers by solar
                   geysers and repair/reconditioning         3             3               1               3
                   of existing solar geysers
             8     Solar Based Street lights for a)
                   Colonies b) Training Institutes           18           12               0               0
             9     Efficient measurement of
                   pumping installations and                 1             2               0               0
                   implementation of action plan
             10    Energy efficient pumps in place of
                   old in-efficient pumps                    10           11               8               7

             11    Automation of pumps                       1            Nil              0               1

             12    Bifurcation of fans in 2/3 circuits at
                   stations to ensure switching off          10           12               0               4
                   fans in non seated areas during
                   non-train hours
             13    Provision of timers for lighting and      20           33               0              20
                   fan circuits
             14    Use of occupancy sensors for light
                   control in a) Officers chambers b)        50           102              0               8
                   Conference rooms c) Waiting
                   Halls.
             15    Reassessing the CMD                       3             -               0               1

             16    Provision of prepaid meters for out     100%          100%            100%            100%
                   siders
   1   2   3   4   5   6   7   8   9   10   11