Page 11 - Electrical TRSO
P. 11

2.3 TRIP SHEDs:


              •  Integration  of  AC  traction  and  Diesel  Traction  Trip  sheds  at  SNF
                  station has been done for effective utilization of diesel traction shed
                  staff in AC traction.


              •  AC  locos  Trip  inspection  schedule  is  being  carried  out  at  DSL/SNF
                  shed.

            3.  SYSTEM IMPROVEMENTS


              3.1 PROMOTIONS:


                 •  274  Nos  LP  and  Sr.ALP’s  were  promoted  as  Adhoc  Loco  Pilot
                     (Goods) and posted at various depots.


              3.2 TRAININGS:

              •  160  No’s  of  Sr.Alp’s  are  undergoing  Loco  Pilot  (Goods)  training  at
                  ETTC /BZA & ZRTI

              3.3 WELFARE OF STAFF


               •  First dose of Covid-19 vaccine was given for 3022(98.5%) and second
                   dose  of  covid  vaccine  was  given  for  2351(76.4%)  of  running  staff
                   without hampering of train services.

               •  Web  based  Crew  Grievance  System  and  e-leaves  systems  are  in
                   function over Secunderabad Division. Due to which the sanctioning

                   of leave for crew was immediately sent to the Staff through SMS and
                   timely redressal of crew grievances by concerned Department.

               •  Sr.DEE,  ADEE  are  regularly  having  personal
                   interactions  with  crew  to  find  out  their
                   personal/official problems.





               •  Sanitization  of  locomotives  in  all  lobbies  and
                   Running  Rooms  was  done  during  lockdown
                   period to avoid spreading of covid-19.
   6   7   8   9   10   11   12   13   14