Page 12 - Electrical TRSO
P. 12
3.4 RELIABILITY / SAFETY:
• Random checking of Loco Pilot’s Closed User Group (CUG) /
Personal mobile phone status while on duty and Surprise mobile
check at en-route stations at an average of 1204 per month has
reduced the menace of keeping the mobile on.
• Ambush checks with speed guns done at an average of 186 per
month by TRSO officers and supervisors. This has alerted crew to
maintain speed at CD spots/Loop lines.
• Speedometer monitoring data downloading and analysis at an
average of 84 per month at all lobbies is being done.
• SPM analysis and VCD data analysis vis-à-vis CTR timings and
counselling the Running staff to run at maximum permissible speed
and also cross checking the safety parameters.
• To monitor the situations and activities over Crew Booking Lobbies,
Crew Running Rooms, Trip Sheds and Railway Consumer Depots,
Surveillance CCTVs with visual record facility are installed and
maintained.
• Crew video and voice recording system data is being downloaded
from the locomotives and analysis is being done. Till now 102 no of
CVVRS data downloaded.
3.5 WORKS UNDER TRSO:
LIST OF SANCTIONED WORKS
Allocation
S Plan Proposed
N Head Description of work Cost Status
o
(Rs.000’s)
6400 Replacement of over aged DRF Work under
1 OSW / dilapidated Running room 27960 progress
at MUGR.
Augmentation/
6400 improvement of Running RRSK Work In
2 OSW room capacity at Chittapur. 20000 Progress.
6400 Augmentation/ CAP Tender
3 improvement of Running under
OSW 4822
Room at Bidar. Finalisation