Page 78 - ENGINEERING
P. 78

28.WEAK FORMATION LOCATIONS ALONG WITH SRNS

                 AND ACTION TAKEN.


                                     Location                               Type of Treatment,
                                        (km)    Length   SR in   Target for
            Sl.No  Section  UP/DN                                            remedial Measure        Remarks
                                                 (Km)   kmph     21-22
                                    From   To                              being done/Proposed



                                                                 March
              1    SC-WD      UP    135    141   6.00    100
                                                                   '22
                                                                                  TFTR with      TFTR Sanctioned
                                                                            (blanketing material )   in PWP 2021-22
                                                                 March
              2    WD-SC     DN     136    141   5.00    100
                                                                   '22
   73   74   75   76   77   78   79   80   81   82