Page 78 - ENGINEERING
P. 78
28.WEAK FORMATION LOCATIONS ALONG WITH SRNS
AND ACTION TAKEN.
Location Type of Treatment,
(km) Length SR in Target for
Sl.No Section UP/DN remedial Measure Remarks
(Km) kmph 21-22
From To being done/Proposed
March
1 SC-WD UP 135 141 6.00 100
'22
TFTR with TFTR Sanctioned
(blanketing material ) in PWP 2021-22
March
2 WD-SC DN 136 141 5.00 100
'22