1.2.6. SUMMARY OF LC GATES IN GQ/GD LINES (A Route gates)
as on 11.11.2021
RUBs RUBs ROBs Total Diver Bala
proposed prop prop RUBs sion/ nce
No.of in PWP 21- osin osin and Mea LCs
mann Sanctions 22 (undue g in g in ROBs gre to
ed available umbrella PWP PWP proposi be
Section LCs as sanction) Balanc 22- 22- ng in prop
e
on 23 23 PWP 22- ose
11.11. 23 d
2021
ROB RUB RUBs
s s
KZJ-BPQ 50 17 13 3 17 8 6 14 3 0
KI-KZJ 44 12 8 14 10 5 4 9 1 0
Total 94 29 21 17* 27 13** 10** 23 4 0
Note : * For these 17 LCs umbrella work sanction is under process.
** These 13 Rubs and 10 ROBs are proposal is under process in PWP 22-23 .
1.2.7. SUMMARY OF LC GATES IN SC-WD SECTION:
No.of Sanctions Feasibl Total
mann available e for RUBs Qualified For
ed RUBs/R and ROB/RUB and
Sr.DEN/ LCs as Total Balan OBs* ROBs cost sharing Remarks
DENs ce propos proposi
on ROBs RUBs proposal sent
10.11. ed in ng in to State Govt,
2021 PWP21- PWP 22-
22 23
State govt
Rlys requested acceptan
state govt for ce
SC-WD 13 1 0 1 12 3 4 cost sharing awaited
proposal (4 for cost
LCs) sharing(4
LCs)
State govt
Rlys requested acceptan
SNF- state govt for ce
HYB-SC 2 0 0 0 2 0 0 cost sharing awaited
(2
for cost
proposal
LCs) sharing(2L
Cs)
Note: SC-WD section 3 RUBs proposed in PWP 21-22 but not sanctioned. Hence
proposed in PWP 22-23.