1.2.4. WORKS CARRIED OUT AT LC GATES TO IMPROVE SAFETY
As on 31.11.2021
Sl.
No Description Manned Planned Completed Remarks
Census has been conducted for
1 Census 242 110 80 80 LCs in 2021. Balance 30 LCs in
progress.
2 Up gradation 242 20 20 -
3 Improvements to 242 50 30 Balance will be completed by
road surfaces March 2022.
4 Approach Gradients - - All the gradients are corrected to
242
IRPWM standards.
5 Retro reflective 242 - - All statutory road warning boards
provided with Retro reflective
boards
type boards at all LCs.
Mechanical boom
locking All non-interlocked LCs have
6 arrangements on 80 - - been provided with boom
non-interlocked locking arrangement.
manned gates.
Mechanical sliding
7 boom arrangements 80 - - All Non-interlocked LCs have
been provided with sliding boom
on non-interlocked arrangement.
manned gates.
1.2.5. ACTION PLAN FOR ELIMINATION OF MANNED LC’s as on 01.04.2021
Mode of elimination
Interlocked/ Total
Sno Total
Non interlocked LCs
ROB RUB
1 Interlocked 169 43 30 73
2 Non interlocked 85 0 13 13
3 Total 254 43 43 86