PROJECTS IN THE DISTRICT HEATING SYSTEM
Consumption growth and capacities of thermal power plants
Renovation of TPP-3 - 160 Gcal/h Expansion TPP-4
EXPANSION AMGALAN TP Expansion TPP-2 340 Gcal/h 190 Gcal/h
100 Gcal/h
Expansion TPP-3
Individual heat source 300 Gcal/h
208 Gcal/h
Denjiin 1000 sub center
80 Gcal/h
1500
2020 2024 2026 2029 2032
CONSUMPTION SOURCE
As of today, the installed capacity of the power sources in Ulaanbaatar city’s centralized heating system has reached
2418 Gcal/h, and the total calculated heat load of total connected consumers has reached 3373.7 Gcal/h. The
graph above shows the forecast of heat consumption growth, assuming an annual increase of 3-4%, and the
expansion and renovation works of power sources to be carried out in the coming years. In addition, according to
the Master Plan for Ulaanbaatar City Development, an additional consumption of about 1600 Gcal/h is planned.
PLANNING MICRO DISTRICT (Until 2040)
Dambadarjaa
54Gcal/h
Selbe
24Gcal/h
Bayankhoshuu
151Gcal/h Denjiin 1000
80Gcal/h
Dari Ekh Shar Khad
7th Micro area 35Gcal/h 116Gcal/h
80Gcal/h Hujirbulan
IKH ZASAG 11.2Gcal/h
Tahilt Bayangol
8.9Gcal/h 62.3Gcal/h AMGALAN TP
PARK-2 Bayanzurkh
TPP-2 16.8Gcal/h
AutoTrade
124.2Gcal/h TPP-3 PARK-1
TPP-4
Morin TOSK
Morin HOSK
18Gcal/h 80Gcal/h
YARMAG
40Gcal/h In addition, according to the Master Plan for the
Development of Ulaanbaatar, consumption will be
increased by 1600 Gcal/h.