Page 46 - HSE -Zero is Possible_v1.0
P. 46

MOROCCO  Cement  Morocco
                           Contact with

                           Hazardous Energy

                           We went digital



                           Description
                           A complete digital solution
                                                      •  Rigorous control of all tasks
                                                       requiring energy isolation
                           was developed in-house to   Results/Impacts
                           track all aspects of energy   •  Standardized procedures
                           isolation from procedure    with the latest version
                           management to electronic    always available created
                           permits and authorization.  institutional understanding
                           PLUS: Multi-year project    of process
                           to ensure best-in-class    •   Only authorized personnel
                           guarding was implemented    can generate work permits
     José Antonio Primo    and maintained.  Integrated   •  Real-time visibility of
          CEO              operational and safety      ongoing energy isolation
                           equipment inspections.      tasks (e.g. Boots on the
                                                       Ground)
                           Key success factors        •  Control room has visibility if
                           •  Multidisciplinary and    operation can be resumed
                            dedicated teams            (following permit closure)
                           •   Professional IT support
                            (internal and external) to
                            develop and maintain the     Physical Guarding
      Khalid Kaaouachi      digital platform             Energy Isolation
       Head of H&S                                       Emergency Stops
                           •  Continuous monitoring
                            of results to improve the
                            process



          Contact with
         Hazardous Energy
    34
   41   42   43   44   45   46   47   48   49   50   51