Page 46 - HSE -Zero is Possible_v1.0
P. 46
MOROCCO Cement Morocco
Contact with
Hazardous Energy
We went digital
Description
A complete digital solution
• Rigorous control of all tasks
requiring energy isolation
was developed in-house to Results/Impacts
track all aspects of energy • Standardized procedures
isolation from procedure with the latest version
management to electronic always available created
permits and authorization. institutional understanding
PLUS: Multi-year project of process
to ensure best-in-class • Only authorized personnel
guarding was implemented can generate work permits
José Antonio Primo and maintained. Integrated • Real-time visibility of
CEO operational and safety ongoing energy isolation
equipment inspections. tasks (e.g. Boots on the
Ground)
Key success factors • Control room has visibility if
• Multidisciplinary and operation can be resumed
dedicated teams (following permit closure)
• Professional IT support
(internal and external) to
develop and maintain the Physical Guarding
Khalid Kaaouachi digital platform Energy Isolation
Head of H&S Emergency Stops
• Continuous monitoring
of results to improve the
process
Contact with
Hazardous Energy
34