Page 64 - HSE -Zero is Possible_v1.0
P. 64

Obourg Cement Plant
                           Structural Collapse
            BELGIUM  Cement  The flying endoscopy






                           Description
                                                   Results/Impacts
                           A new drone technology
                           that is capable of
                                                    height (120m)
                           monitoring stack and    •  Elimination of work at
                                                   •  Cost savings: 5 k€ vs.
                           duct corrosion was       25 k€ (crane & alpinists)
                           implemented which       •   Easy-to-deploy solution
                           automates surface        (40+ measurements in
                           cleaning and ultrasonic   1 hour)
                           thickness measurement.
                           Key success factors


     Morgan Malecotte      •  Early adopter mindset    Quality Control &
          CEO                                        Assurance
                                                       Preventive
                                                     maintenance &
                                                     Inspections




                                                       Structural Protection


                                                       Safe Operating Limits
                                                       Exclusion Zones


       Oscar Lansford
       Head of H&S

          Structural
          Collapse
    52
   59   60   61   62   63   64   65   66   67   68   69