P. 15

Rudinata AGG Plant
       Energy

       Green energy for all

       administrative buildings on site                                                                     BULGARIA  Aggregates



       Opportunity                Results
       Reduction of Scope 2 emissions   Typically, the administrative
       from purchased electricity   buildings are fully powered
       consumed in our sites.     by green energy, meeting
                                  100% of their daily electricity
       Solution                   requirements. The CO₂
       Installation of a 10 kW    reduction calculated by
       photovoltaic system to cover   the app surpassed initial
       all electricity needs of the   expectations by 23%, with
       administrative buildings.  3.26 tCO₂ saved compared to
       •  The project was implemented   the planned 2.65 tCO₂ over a                                    Rossen Papazov
        as part of HSE-IP and became   120-day period. Additionally,                                        CEO
        operational on December 1 ,   the system ensures
                             st
        2023.                     uninterrupted customer
       •  The installation supplies two   service during power outages
        buildings where dispatch,   from the external supplier.
        offices and welfare facilities
        are located.
       •  A mobile app from SolaX
        Power was connected to
        the PV installation in March                                                                    Desislava Kirova
        2024, allowing for real-time                                                                       Head of
        monitoring of its status.                                                                        Environment