Page 17 - Zero is Possible - Volume 2 Grey
P. 17
Cartago Cement Plant
Energy A RICA
Compressed
COST Cement
air power patrol
Opportunity Results
Monitor and control • Scope2 CO2 emissions
the energy consumed reduction: 16%
by the compressed air • Operational costs
units to reduce power reduction: 16%
consumption.
Solution
Installation of meters Natalia Soler
and a control system to CEO
detect leaks, inefficient air
distribution systems, and
suboptimal performance
of the main filter
compressor.
Cost 8,500 CHF
Timeline: 1 year
(from concept to Camilla Angelini
implementation) Head of
Sustainability
and CSR
13