Page 84 - Zero is Possible - Volume 2 Grey
P. 84

Bazian Cement Plant
                           Liquid fuel fire

                           Liquid fuel, solid safety:

           IRAQ  Cement    advanced storage

                           and fire protection



                           Opportunity             •  Conducted hydro and
                           Enhance the management   air tests to ensure a leak-
                           of liquid fuel storage   free, secure system
                           by addressing key
                           challenges:               Investment: 1.28 MCHF
                           •  Increase storage
                            capacity to meet       Results
       Medhat Ismail        operational demands    •  Increased compliance
          CEO              •  Upgrading safety      with critical safety
                            with compliant fire-    controls
                            fighting and explosion   •  Enhanced safety in
                            protection systems for   liquid fuel storage and
                            risk mitigation         handling, reducing
                                                    explosion risks
                           Solution
                           •  Installed a new 5,000 m³
                            storage tank with
      Amanje Rasheed        automated fire-fighting
       Head of H&S          foam systems and
                            explosion-proof features




         Liquid Fuel Fire

    72
   79   80   81   82   83   84   85   86   87   88   89