Page 86 - Zero is Possible - Volume 2 Grey
P. 86

Rashadiya Cement Plant
                           Pollution
           JORDAN  Cement  From old to coal: A smart



                           storage transformation





                           Opportunity             Results
                           Convert the old limestone   •  Complied with
                           storage into a coal hall,   regulatory
                           meeting environmental    environmental
                           and HSE standards.       requirements
                                                   •  Saving of 1.2 MCHF
                           Solution                 compared to the
                           •  Transforming Line 2   construction of new
      Samaan Samaan         Limestone yard to Coal   storage hall
          CEO               yard, cost of 184.5 kCHF  •  Improved ambient air
                           •  Separating Line 2 with a   quality in the working
                            partition wall          area
                           •  Installing fire fighting
                            and detection systems
                            per H&S risk assessment
                           •  Leveling the storage floor


        Raed Musa
    Head of Environment
        & Geocycle




          Pollution

    74
   81   82   83   84   85   86   87   88   89   90   91