Bremen Grinding Plant
            GERMANY  Cement  Hazardous Energy
                           Contact with




                           We have a net!




                           Opportunity             Results
                           Finding a way to properly   Easy and quick to install
                           protect workers from    machine guarding at
                           getting trapped in a    low cost compared to
                           conveyor belt or being hit   machine guarding made
                           by objects falling from   from metal.
                           the belt and having easy   Reduced time for
                           access to the area for   cleaning below the belt
                           cleaning purposes.      while keeping a high level
       Thorsten Hahn                               of safety at work.
          CEO              Solution
                           •  Installation of a close-  This solution was awarded
                            meshed net, that is    by ArcelorMittal which is
                            tightly clamped        surrounding our site in
                           •  Can only be removed   Bremen.
                            with tools
                           •  It is not possible to reach
                            moving equipment in or
                            around the net.
     Michael Schöndienst   •  Cost: 300 CHF
       Head of H&S          (8m x 2.7m)





         Contact with
         Hazardous Energy