Page 90 - Zero is Possible - Volume 2 Grey
P. 90
Bremen Grinding Plant
GERMANY Cement Hazardous Energy
Contact with
We have a net!
Opportunity Results
Finding a way to properly Easy and quick to install
protect workers from machine guarding at
getting trapped in a low cost compared to
conveyor belt or being hit machine guarding made
by objects falling from from metal.
the belt and having easy Reduced time for
access to the area for cleaning below the belt
cleaning purposes. while keeping a high level
Thorsten Hahn of safety at work.
CEO Solution
• Installation of a close- This solution was awarded
meshed net, that is by ArcelorMittal which is
tightly clamped surrounding our site in
• Can only be removed Bremen.
with tools
• It is not possible to reach
moving equipment in or
around the net.
Michael Schöndienst • Cost: 300 CHF
Head of H&S (8m x 2.7m)
Contact with
Hazardous Energy
78