Page 58 - Zero is Possible - Volume 3
P. 58

Lefka
                         Fall from height &
           GREECE  Ready-mix  Confined space


                         No way in

                         and that's a win


                         Opportunity             Cost: 1,500 CHF
                         Daily cleaning of the RMX   Timeline: 2 weeks
                         discharge chute involved
                         two workers exposed to   Results
                         risk of falling from height   •  Risks of Working at
                         and confined space entry.   Height and Confined
                         A safer and more efficient   Space entry were
                         way had to be possible.  permanently removed
      Dimitrios Chanis                           •  No more high risk
          CEO
                         Solution                 permits nor scaffolding
                         •  Hierarchy of Controls   required
                          was applied by the team   •  Operation is now
                          to engineer a solution   performed by a single
                          eliminating the hazards  operator in 10 minutes
                         •  A working platform with   instead of 1.5 hours
                          an access ladder were   •  A complex high-risk daily
                          retrofitted providing safe,   task is now a simple and
                          direct access to the chute   safe routine
       Dimitra Kasola     and no longer requiring
        Head of H&S
                          scaffolding erection nor
                          confined space entry



         Fall from Height