Page 62 - Zero is Possible - Volume 3
P. 62

Biskra
                         Contact with
           ALGERIA  Cement  Hazardous Energy



                         Safe from below:

                         Counterweight lock

                         innovation

                         Opportunity              •  Integrated into new Energy
                         To eliminate gravitational   Isolation procedures
                         energy risks and fall hazards
                         during counterweight     Cost: 3 kCHF
                         isolation, a mechanical   Timeline: 3 months
                         locking system was
                         engineered. The goal: ensure   Results
     Adham ElSharkawy
           CEO           safe maintenance and full   •  Safe isolation: Full
                         energy control, without   mechanical energy control
                         working at height.        with dedicated SOPs
                                                  •  Fall risk removed: All
                         Solution                  isolation actions done
                         A custom lock system was   from the ground
                         designed and implemented   •  Improved compliance
                         to safely isolate         with critical controls
                         counterweights:          •  Scalable: 14 units already
      Amina Kocheida     •  Validated locks to     installed across other sites
      Head of HSE and     safely block suspended
       Sustainability     counterweights
                         •  Ground-level isolation; no
                          elevated access needed


         Contact with
         Hazardous Energy