Page 25 - Zero is Possible - Volume 2
P. 25
Bazian Cement Plant
Waste
Recycling the shutdown
IRAQ Cement
Opportunity Results
Eliminate the disposal • All was segregated
of waste generated during last shutdown
during kiln shutdown • 22 tonnes of solid waste
(KSD) maintenance, while collected
enhancing housekeeping • 81% recycled as
at the plant. alternative fuel
Solution
Launched the “Collect it,
Shred it” initiative:
• Daily housekeeping with Medhat Ismail
increased frequency CEO
during shutdown
• Assigned 8 Area Owners
• Mapped waste
generation and disposal
• Introduced a waste
recycling program and
monitoring system
Amanj Saeed
Plant Environment
Manager
19