Page 29 - Zero is Possible - Volume 2
P. 29

Jacksonville
       Waste

       Insulation dust briquettes

       get a second act                                                                                       Solutions    & Products


       Opportunity            Results                                                                     HBE
       During the Polyiso board   Facility diverted 272
       manufacturing process,   tonnes of waste from
       insulation dust from   landfill between January
       cutting operations is   2023 - May 2024.  Similar
       collected. The dust is   opportunities are being
       then briquetted to reduce   investigated across similar
       its volume and, generally,   operating facilities.
       sent to landfill as waste.

       Solution                                                                                        Jamie Gentoso
       The facility identified                                                                             CEO
       a local wastewater
       treatment facility
       that was looking for
       alternative sources of
       absorbent to use in their
       treatment process. All
       of the insulation dust
       briquettes are now reused
       by the local wastewater                                                                           Kevin Bretz
       treatment facility as                                                                            Head of HSE
       absorbent.







                                                                                                                    23
   24   25   26   27   28   29   30   31   32   33   34