Page 118 - CRS E-booklet 2022
P. 118
116
Sl.
No. Station SECTION TYPE POH Due/ Not Due
67 SRUR SRUR-VEM SGE 01.12.17 No Due
68 SRUR-MKDI SGE 01.09.18 No Due
69 MKDI MKDI-SRUR SGE 01.01.19 No Due
70 MKDI MKDI-WIRR SGE 01.11.16 No Due
71 WIRR-MKDI SGE 01.12.20 No Due
72 WIRR WIRR-VHGN SGE 01.01.18 No Due
73 WIRR-VHGN UFSBI 01.06.20 No POH
74 VHGN-WIRR UFSBI 01.06.20 No POH
75 VHGN VHGN-WIRR SGE 01.01.20 No Due
76 VHGN-MAGH BP SGE 01.05.20 No Due
77 VHGN-MAGH BP UFSBI 01.06.20 No POH
78 MAGH BP-VHGN UFSBI 01.06.20 No POH
79 MAGH BP MAGH BP-VHGN SGE 01.01.21 No Due
80 MAGH BP-MAGH SGE 01.01.20 No Due
81 MAGH BP-MAGH UFSBI 01.01.20 No POH
82 MAGH-MAGH BP UFSBI 01.01.20 No POH
83 MAGH MAGH-MAGH BP SGE 01.01.19 No Due
84 MAGH-BPQ SGE 01.01.20 No Due
85 BPQ BPQ/RRI-MAGH SGE 01.07.17 No Due
8. SYSTEM INTEGRITY TEST: Summary:
Total No of stations Total No of stations Balance
due in 2022-23in done in 2022-23 in to be Remarks
KZJ-BPQ section KZJ-BPQ section done
05 03 02 HSP- Due on 14.02.2023
KMTP – Due on 01.01.2023
Details:
Sl.
No. Station / Cabin Test done on Due / Not Due
1 MAGH 10.11.2021 No Due
2 MAGH BP-1 10.11.2021 No Due
3 VHGN 14.11.2021 No Due
4 WIRR 14.11.2021 No Due
5 MKDI 04.07.2020 No Due
6 SRUR 25.05.2018 No Due
7 VEM 18.02.2020 No Due
8 RLT 20.02.2020 No Due
9 SKZR 17.03.2021 No Due
10 ASAF 17.10.2018 No Due
11 RLW 04.01.2019 No Due