Page 123 - CRS E-booklet 2022
P. 123
121
Date of
Sl.No. LC No. Class Station/ Section
Commissioning
34 LC NO. BP-04 SPL SNF-AMQ 10.12.2019
35 LC NO. BP-05 SPL SNF-AMQ 10.12.2019
36 LC - 95 B2 MAGH-BPQ 26.02.2020
37 LC - 84 B1 GUU-MABD 24.06.2020
38 LC-18 B2 OPL-JMKT 13.03.2021
39 LC-02 B2 VKB-SSPD 13.05.2021
40 LC-12 B2 HSP - OPL 09.10.2021
41 LC-25 B2 BGSF-PTKP 23.01.2022
42 LC-42 B2 PDPL-RGPM 03.01.2022
43 LC-23 B2 BGSF-JMKT 03.02.2022
44 LC-27 C PTKP-BGSF 04.04.2022
13.2 LC GATES TO BE INTERLOCKED: Executing by Open line (SC Division):
Sl.
No. LC Gate No Section Sanctions Remarks
Tenders Opened.
LC - 26 GDRA-KRMR Sanctioned TCP under
1 under Umbrella
Km No. 48/2-3 TVUs-26837 progress. TDC:
2021-22
02/2023
LC - 79 VEM-SKZR
2 Detailed
Km no. 195/23-25 TVUs- 20119 Estimate
LC - 08 HSP-OPL Sanctioned preparation is
3 under LSWP
Km No. 317/4-6 TVUs- 17549 2022-23 under progress
LC - 15 OPL-JMKT
4 TDC: 06/2023
Km No. 289/8-10 TVUs- 23475
13.2 LC GATES DETAILS IN KZJ-BPQ SECTION
Total No of
Total No of LC
Interlocked LC
GATES in KZJ-BPQ GATES in KZJ-BPQ Remarks
section
section
1. LC-79(SKZR-VEM), LC-08(HSP-OPL)
and LC-15(OPL-JMKT) LC Gates is
eligible for Interlocking. Interlocking
50 46 of LC gate sanctioned under
Umbrella 22-23.Detailed Estimate is
under preparation.
2. LC-73 (ASAF-RLT) – Proposed for
closure of Gate.
Details: