8.2 ANALYSIS OF DEFECTS DETECTED DURING USFD TESTING OF RAILS/WELDS BETWEEN BPQ-KZJ
                   UP AND DN LINES:


                                            UP/         Frequency     IMR/    OBS    OBS    Defective  Defective
             Testing Description  Section         GMT                                                                   Action taken         Remarks
                                            DN           of testing  IMR(W)   (R)     (W)    (DFWO)      (DFWR)

                                                                                                                                          Along with NBC/
                                                         once in 3                                                   All are Joggled fish   GFC/NGFC Rail
                                 BPQ-BPA    UP  38.35                  2       67      3
                                                          months                                                           plated            testing the
                                                                                                                                            following tests
                                                                                                                                           such as Winter
                                                         once in 3                                                   All are Joggled fish    precaution
                                 BPQ-BPA    DN   37.04                 5       49      6                                                   testing, Test free
                                                          months                                                           plated
              NBC/GFC/NGFC                                                                                                                      rail
                                                                                                                                           testing,Switches
                 Rail testing                                                                                                             and Intensive rail
                                            UP           once in 3                                                   All are Joggled fish
                                  BPA-KZJ        37.76                 2      101      4                                                     testings are
                                            /UD           months                                                           plated           carried in the
                                                                                                                                              Division.
                                                                                                                                            All IMR/IMRW
                                                         once in 2                                                   All are Joggled fish   were replaced
                                  BPA-KZJ   DN   49.69                 1       61      7
                                                          months                                                           plated          within 3 days of
                                                                                                                                           their detection.
              Flaw detected in
               1) Service weld   BPQ-BPA    UP  38.35    once in 3                              34                 All are fish plated with
              testing(Including                             yrs                                                    two far end tight bolts
                welds on high
               banks,cuttings    BPQ-BPA    DN   37.04   once in 3                              48                 All are fish plated with   DFWR will be
                                                                                                                                           replaced within
                 and curves)                                yrs                                                    two far end tight bolts  3 months after it
                 2)New weld                                                                                                                 is detected.
                   testing                  UP           once in 3                                                 All are fish plated with   DFWR is
              3) Fracture prone   BPA-KZJ   /UD  37.76      yrs                                 60          1      two far end tight bolts   replaced.
                  locations
                 4) All major                            once in 2                                                 All are fish plated with
                bridges and       BPA-KZJ   DN   49.69      yrs                                 83                 two far end tight bolts
                approaches.                                                                                                                                        68

                                      Total                            10     278     20       225          1