13. ELECTRIC LOCO SHED/KAZIPET


               SYSTEM IMPROVEMENTS


                 For  improvement  of  Greenery  area  inside  the  shed  premises,
                   around 2400 sq feet area is converted into Garden.


                 50  no’s  Smart  energy  meters  provided  in  shed  to  measure  energy
                   consumption on line.

                 Modification of Pressure Reducing Valve (PRV) in VCB.


                 Provision of in Built pressure gauge to check & trouble shoot in
                   the cases of DJ feedback fail/VCB stuck off/VCB Stuck on and
                   during schedule maintenance.


                 First  ELS  in  SCRly  devoloped    Power  module  test  kit  for  Medha
                   Traction  Converter  in-house  to  test  the  all  sub  equipment  of
                   power module.


                 In  house  development  of  Racks  to  utilize  vertical  space  inside
                   section rooms and proper material stocking.


                 2  no’s  newly  received  M&P  equipments  are  installed(  Abro
                   dynamic  balancing  machine  &    TFP  oil  filtration  plant  of  Nach
                   make)


                 No staff are overdue for Refresher  course(SSE:15, Tech:21)


                 Imparting  of  training  to  diesel  shed  staff    to  improve  the
                   maintenance activities in WAG7 during 2022-23 is 70  staff


                 Existing  21  Conventional  Relay  based  WAG7  locos  are
                   Converted  into  Micro  processer  Based  control  system  of  V3

                   version.
                 12  conventional  locos    are    provided  with  DPWCS  system  of

                   M/s.LWT make




                                                             287