13. ELECTRIC LOCO SHED/KAZIPET
SYSTEM IMPROVEMENTS
For improvement of Greenery area inside the shed premises,
around 2400 sq feet area is converted into Garden.
50 no’s Smart energy meters provided in shed to measure energy
consumption on line.
Modification of Pressure Reducing Valve (PRV) in VCB.
Provision of in Built pressure gauge to check & trouble shoot in
the cases of DJ feedback fail/VCB stuck off/VCB Stuck on and
during schedule maintenance.
First ELS in SCRly devoloped Power module test kit for Medha
Traction Converter in-house to test the all sub equipment of
power module.
In house development of Racks to utilize vertical space inside
section rooms and proper material stocking.
2 no’s newly received M&P equipments are installed( Abro
dynamic balancing machine & TFP oil filtration plant of Nach
make)
No staff are overdue for Refresher course(SSE:15, Tech:21)
Imparting of training to diesel shed staff to improve the
maintenance activities in WAG7 during 2022-23 is 70 staff
Existing 21 Conventional Relay based WAG7 locos are
Converted into Micro processer Based control system of V3
version.
12 conventional locos are provided with DPWCS system of
M/s.LWT make