Page 6 - GM E-BOOKLET 2022
P. 6

6.0  TRACK STRUCTURE


                         ROUTE             FROM-TO                RT KM           TKM           STNS.

                            A              BPQ-BZA                434.30        972.27           50

                            B             KZJ-SC-WD               329.29        678.728          46

                                           VKB-PRLI               267.35        267.35           23


                                      DKJ-MUGR, KRA-
                                        SYI, MLY-SNF,
                            D          PDPL-LPJL-NZB,
                                       MAGH-GDCR,                866.830        866.970          26
                                         MTMI-JNPD,
                                      KHNP-TSJP, TLPR-
                                             RCPT


                                             TOTAL               1630.42        2517.97         144







               7.0. LEVEL CROSSINGS: As on 31.10.2022


                                                          DEPARTMENT              INTERLOCKING

                           CATEGORY            Nos                                 Inter        Non
                                                       ENGG  TRAFFIC                             Inter
                                                                                  locked
                                                                                               locked

                            MANNED             230       152           78           161           69
                          UNMANNED               -         -           ---           --            -
                              TOTAL            230       152           78           161           69


                        Sanctioned for RUBs --- 35Nos, Target 2022-23 ---- 12
                        (3 completed & 9 work in progress)

                        Sanctioned for ROBs --- 42Nos,   Target 2022-23 ---- 0
                        (Being done by Construction)

                        Total RUBs/ROBs sanctioned----77 Nos           Total ----- 12(Target)
                        Elimination of MLCs: Target 2022-23 ---12Nos, Progress: 4 Nos .
                        Note – Out of 35 RUBs, 6 RUBs are not feasible, hence proposed

                        for dropping. Balance RUBs feasible 35-6=29