2.9. SEMINAR ON WINTER PRECAUTIONS:
Seminar has been conducted on winter precautions in track
maintenance on 05.11.2022 in Hawa mahal/ Sanchalan bhavan in the
presence of CTE/SC, DRM/SC, ADRM/I/SC, Sr.DENs/DENs, all ADENs,
SSE/Pways, mate & Keymen. 2 nos of books i.e compendium book &
Technical papers booklet have been released. Also various papers on
monsoon precautions have been presented by ADENs & SSEs/P way
2.10. RELAXATION/REMOVAL OF PSRs:
4 nos of PSRs have been removed upto the October 2022 in the
Secunderabad Division.
S. Bet.Stati From Reason of SR Relaxed
No. Section on km To km PSR kmph speed Remarks
Total curve
including points &
P&C on 1
BPQ-KZJ MCI 261/1 260/4 crossings was
1 degree 100 110
(UP) Yard 1 3 tamped to rectify
curve
variation of Versine
and SE
Series of
sharp
SNF-MLY SNF- curves high 20RP rail panel
2 1/0 03/05 30 50
(SL) AMQ bank & required for TRR(P)
inhabitation
n
Overriding switches
replaced with TWS
BPA Yard BPA 240/1 241/1 Series of for points
3 100 110
(DN) Yard 6 6 turnouts 61A,60B,59B,53A,50
A,8A,7A,6A,5A on
DN main line
Relaxed in 2021-22.
PDPL-NZB KRMR- Yielding
4 29/2 31/9 90 100 Removed during
(SL) STBD formation
the year 2022-23