2.9. SEMINAR ON WINTER PRECAUTIONS:

                     Seminar  has  been  conducted  on  winter  precautions  in  track
                     maintenance on 05.11.2022 in Hawa mahal/ Sanchalan bhavan in the
                     presence  of  CTE/SC,  DRM/SC,  ADRM/I/SC,  Sr.DENs/DENs,  all  ADENs,
                     SSE/Pways,  mate  &  Keymen.  2  nos  of  books  i.e  compendium  book  &
                     Technical  papers  booklet  have  been  released.  Also  various  papers  on
                     monsoon precautions have been presented by ADENs & SSEs/P way













               2.10. RELAXATION/REMOVAL OF PSRs:

                     4  nos  of  PSRs  have  been  removed  upto  the  October  2022  in  the
                     Secunderabad Division.


                S.              Bet.Stati  From             Reason of      SR     Relaxed
               No.   Section      on       km      To km       PSR       kmph      speed          Remarks
                                                                                                 Total curve
                                                                                              including points &
                                                            P&C on 1
                     BPQ-KZJ      MCI     261/1    260/4                                        crossings was
                1                                            degree       100       110
                       (UP)      Yard       1        3                                        tamped to rectify
                                                              curve
                                                                                             variation of Versine
                                                                                                   and SE
                                                             Series of
                                                              sharp
                     SNF-MLY      SNF-                     curves high                         20RP rail panel
                2                          1/0     03/05                   30        50
                       (SL)      AMQ                         bank &                          required for TRR(P)
                                                           inhabitation
                                                                n
                                                                                             Overriding switches
                                                                                             replaced with TWS
                     BPA Yard     BPA     240/1    241/1     Series of                            for points
                3                                                         100       110
                       (DN)      Yard       6        6       turnouts                        61A,60B,59B,53A,50
                                                                                              A,8A,7A,6A,5A on
                                                                                                DN main line
                                                                                             Relaxed in 2021-22.
                     PDPL-NZB    KRMR-                       Yielding
                4                          29/2    31/9                    90       100       Removed during
                       (SL)      STBD                       formation
                                                                                              the year 2022-23