Energisation of 4&5 of RKP-II siding at MCI station (TKM: 4.72, RKM: 2.555 KM):
Energisation of newly lied OHE on Road 4&5 of RKP-II siding at MCI station from OHE
mast Loc. No. RKP II/4/1001A (Km.Ch.04/29.70) to Loc. No.RKP II/6/18
(Km.Ch.06/585.0) done on 27.08.2022 after duly obtaining the EIG vide sanction no.
2208025, dated: 22.08.22 and trail run conducted.
Fig: Charging of 4 & 5 Lines of RKP-II Sdg at MCI
Energisation of newly electrified BG line between KHNAPUR(Excl.)-LATUR (Incl.)
ROAD in VKB-PRLI section (RKM: 98.57, TKM: 112.60 KM):
As a part of electrification works of single Broad Gauge(BG) line between Vikarabad
(VKB) – Parli Vaijnath(PRLI) of TKM: 313.86 (269 RKM), the section between
Khanapur(KHNP), Latur Road(LTRR) of TKM 113 (98.6 RKM) has been commissioned on
29.09.2022 after duly obtaining the EIG sanction vide statutory authorisation number
2209035. With this 236.25 TKM (RKM: 203.81) of electrification has been completed
between VKB-PRLI.
Fig: Speed trial commencement LTRR-KHNP Fig: Inspection of chamfer & hole in neutral axis
Energisation of Patch tripling works between CHERUV MADHAVARAM(CVV)-
KONDAPLLI (KI) in KZJ-BZA section (TKM: 5.52, RKM: 5.52 KM):
As a part of patch tripling works between KI-BPQ, the section between CVV-
KI of 5.52 TKM/RKM III line (U/D) has been energized on 20.09.2022, after
rd
duly obtaining the EIG sanction vide sanction number 2208027,
Dated:16.08.2022 & statutory CRS and EIGoI inspection.
Inspection of Neutral section @loc. 565/22 Insp.& Measurement of ATD parameters