Page 49 - August-2020-Issue
P. 49

NALCO Clocks All Time High Production of


              Bauxite and Alumina Amidst Corona Crisis





                 Company with Precautions in place for COVID 19 Pandemic, NALCO Surpasses 100%
                 Capacity Utilisations in its Mines & Refinery
                 NALCO Tides Over Coal Crisis with 90% Capacity Utilisation of Aluminium Smelter




                     ational     Aluminium
                     Company        Limited
              N(NALCO),  has  recorded
              an all-round  success  in baux-
              ite and  alumina  productions
              in  the  Fiscal  2019-20.    It  may
              be mentioned that with more
              than  100%  capacity  utilization,
              NALCO’s  Panchpatmali Mines
              has achieved bauxite  produc-
              tion of 73.02 lakh MT, which is
              highest ever since company’s in-
              ception. Bauxite  transportation
              has gone up to 73.02 lakh  MT,
              which is also highest ever so far.
              Company’s  Alumina  Refinery  on-going sluggish metal market,   of alumina and aluminium in
              has  produced  highest-ever  21.61  we would be able to tide over   the  country, has been  granted
              lakh MT of Alumina Hydrate and  the downturn by continuing to   the  mining  lease  of  Utkal-D
              set a new record. Steam & Power  keep our focus on bauxite mining   coal block by the Government
              Plant (SPP) of Alumina Refinery  and  alumina  refining  arm,  cou-  of  Odisha  through  a  notifica-
              has also achieved highest ever net  pled with several cost reduction   tion issued recently by Depart-
              power generation.               measures.                       ment  of  Steel  &  Mines.  As
              The  Aluminium Smelter of       Worth  mentioning  that  despite   per  the  notification,  the  mining
                                                                              lease  of  Utkal-D  coal  block  is
              NALCO has achieved more than    COVID-19 crisis, NALCO’s  all   over an area of 301.28 hects in
              90% capacity utilization with cast   units are operational with re-  villages Kosala, Nandichood,
              metal production of 4.18 lakh MT   duced manpower and contribut-  Similisahi and Raijharan under
              in spite of facing acute coal crisis  ing to the national economy. The
              in the monsoon season  and also  company is implementing ade-   Chendipada  Tahasil  of  Angul
              the recent Corona virus pandem-  quate social distancing and saniti-  District.
              ic.  Also noteworthy is that the  zation measures in its plants and   It may be noted that upon
              DC energy consumption at com-   residential areas to safeguard its   execution of  mining lease  deed,
              pany’s  smelter  plant was  at the  employees and workers against   NALCO is considering to open
              lowest in 2019-20.              corona virus exposure.          Utkal-D coal block in the financial
                                                                              year 2020-21. The initial capacity
              Attributing  record  performance                                of  Utkal-D  coal  block  is  2  mill-
              to the teamwork and dedication   NALCO Gets Mining Lease        ion tonnes per year with a
              of employees, Mr. Sridhar Patra,   for Utkal-D Coal Block       total  mineable  reserve  of  101.68
              CMD, NALCO said that  in the  NALCO one of leading producer     million tonnes.



                                                                              KaleidOscope  May, 2020   49
   44   45   46   47   48   49   50   51   52   53   54