Sejarah kelistrikan di Batam telah berjalan selama 48   The history of electricity in Batam has been around for   Performance Highlights  Ikhtisar Kinerja
                  tahun. Seiring dengan pertumbuhan kawasan Batam yang   48 years. Along with the rapid growth of Batam area,
                  pesat, penyediaan energi listrik dilakukan oleh bright   electricity supply is conducted by bright PLN Batam with
                  PLN Batam dengan komitmen memberikan pelayanan   a commitment to provide the best service for customer
                  terbaik untuk kepuasan pelanggan. Kiprah pengelolaan   satisfaction. The gait of electricity management to
                  ketenagalistrikan untuk melayani kebutuhan listrik   serve the electricity needs of the people of Batam, in the
                  masyarakat Batam, awalnya dilakukan oleh Pertamina,   beginning was conducted by Pertamina, precisely in 1971.
                  tepatnya pada tahun 1971.

                  Saat  itu,  Pertamina  dipercaya  sebagai  instansi   At that time, Pertamina was believed to be the first agency   Report to Shareholder and Stakeholder
                  pertama yang mengelola daerah industri Pulau Batam.   to manage Batam Island industrial area. Capitalized
                  Bermodalkan PLTD yang memiliki daya pasang cukup   PLTD which has low power, 2 x 188 kVA.
                  rendah, 2 x 188 kVA.                                                                               Laporan Kepada Pemegang Saham & Pemangku Kepentingan

                  Seiring dengan perkembangan Batam yang mulai   Along with the development of Batam which began to
                  meningkat, akhirnya tahun 1976 pemerintah Indonesia   increase, in 1976 the Indonesian government established
                  membentuk Otoritas Pengembangan Daerah Industri   Batam Island Industrial Area Development Authority
                  Pulau Batam (OPDIPB) untuk mengelola kota yang   (OPDIPB) to manage this scorpion-shaped city where
                  berbentuk Kalajengking ini dimana Kepala OPDIPB   the Head of OPDIPB is handed over to the Minister of
                  diserahkan ke tangan Menteri Penertiban Aparatur   Administrative Development Control, JB Sumarlin. Since
 Saat ini bright PLN Batam   Pembangunan JB Sumarlin. Sejak itu, semua proyek yang   then, all projects managed by Pertamina were taken over
                  dikelola Pertamina diambil alih oleh OPDIPB, termasuk
                                                                 by OPDIPB, including electricity management. During
 memegang peranan penting  pengelolaan ketenagalistrikan. Bisnis ketenagalistrikan   that period electricity business was then managed by   Company Profile  Profil Perusahaan
                                                                 Batam Authority Technical Implementation Unit (UPT
                  saat itu dikelola Unit Pelaksana Teknis Otorita Batam
                                                                 OB). Generator capacity was still low, only 17.5 MW.
                  (UPT OB). Kapasitas pembangkit pun masih rendah,
 dalam mendukung   hanya sebesar 17,5 MW.
 tersedianya energi listrik di   Tepat tahun 1978 Ketua Otoritas Batam dipegang oleh   In 1978 the Chairman of Batam Authority was served
                                                                 by Prof. Dr. Ing Bj. Habibie. In Habibie’s leadership era,
                  Prof Dr Ing Bj. Habibie. Di era kepimpinan Habibie ini,
 Indonesia, bukan hanya di   Batam sudah mulai diarahkan sebagai kota industri.   Batam has begun to be directed as an industrial city.   Business Support Review  Tinjauan Pendukung Bisnis
                                                                 Electricity as a vital requirement in industry and business
                  Listrik sebagai kebutuhan vital dalam industri dan
                  kalangan usaha, tentu membutuhkan pasokan listrik
                                                                 circles, surely requires electricity supply, thus from that
 Pulau Batam, Rempang,   dan mulai saat itu dilakukan pembangunan PLTD di   moment on, the construction of PLTD in Sekupang and
                                                                 Batu Ampar were commenced. The total installed power
                  Sekupang dan Batu Ampar. Total daya terpasang pada
 Galang dan sekitarnya.  periode 1976-1992 sebesar 45,5 MW dan disalurkan   in 1976-1992 was 45.5 MW and distributed to Sekupang
                                                                 and Batu Ampar areas.
                  ke daerah Sekupang dan Batu Ampar.
                  Pada tanggal 1 Januari 1993 berdasarkan        On January 1, 1993 based on the agreement of the
                  kesepakatan Pemerintah dan Otorita Batam       Government and the Batam Authority, the management
 Today, bright PLN Batam   pengelolaan ketenagalistrikan diserahkan kepada   of electricity was handed over to PT PLN (Persero)
 plays an important role in   PT PLN (Persero) dengan membentuk unit PT PLN   by establishing a unit of PT PLN (Persero) for Batam   Management Discussion & Analysis  Analisa & Pembahasan Manajemen
 supporting the availability   (Persero) Wilayah Khusus Batam. Berdasarkan   Special Region. Based on the decision of the State
                                                                 Minister for Investment and Development of BUMN, as
                  keputusan Menteri Negara Penanaman Modal
 of electricity in Indonesia,   dan Pembinaan BUMN, selaku Pemegang Saham     the Shareholder of PT PLN (Persero) in the letter No. S-23
 not only in Batam Island,   PT PLN (Persero) dalam surat No S-23/M-PMPBMUN/   / M-PMPBMUN/2000 dated August 23, 2000.
                  2000 tanggal 23 Agustus 2000.
 Rempang, Galang and
 surrounding areas.  Pada tanggal 3 Oktober 2000, status PT PLN (Persero)   On October 3, 2000, PT PLN (Persero) Batam Special
                  Wilayah Khusus Batam berubah menjadi PT Pelayanan   Region’s status changed to PT Pelayanan Listrik Nasional
                  Listrik Nasional Batam (PLN Batam) dengan status   Batam (PLN Batam) as a subsidiary of PT PLN (Persero),   Tata Kelola Perusahaan
                  sebagai anak Perusahaan PT PLN (Persero), sebagai   as an independent unit that manages electricity from   Good Corporate Governance
                  unit mandiri yang mengelola kelistrikan dari hulu sampai   upstream to downstream. Furthermore, on March 1,
                  hilir. Selanjutnya pada tanggal 1 Maret 2008 PLN Batam   2008 PLN Batam rebranded and set new branding of
                  melakukan rebranding dan menetapkan branding baru   itself, including Brand Personality and Brand Identity
                  meliputi Brand Personality dan Brand Identity dengan   with the company’s nickname, became bright PLN Batam.
                  nama panggilan perusahaan menjadi bright PLN Batam.

                  Saat ini bright PLN Batam memegang peranan penting   Today, bright PLN Batam plays an important role in
                  dalam mendukung tersedianya energi listrik bukan hanya   supporting the availability of electricity not only in Batam   Risk Management  Manajemen Risiko
                  di Pulau Batam, Rempang, Galang dan sekitarnya namun   Island, Rempang, Galang and surrounding areas, but also
                  juga Pulau Bintan dan 8 Kota tersebar di Indonesia   Bintan Island and 8 cities spread in Indonesia, namely
                  yaitu Nias, Paya Pasir Medan, Balai Pungut Duri, Air   Nias, Paya Pasir Medan, Balai Pungut Duri, Air Anyir
                  Anyir Bangka, Suge Belitung, Tarahan Lampung, Parit   Bangka, Suge Belitung, Tarahan Lampung, Parit Baru
                  Baru Pontianak dan Jeranjang Lombok melalui peran   Pontianak and Jeranjang Lombok through bright PLN
                  bright PLN Batam sebagai Perusahaan IPP tenaga listrik.   Batam role as an IPP Electric Power Company. Currently
                  Kini bright PLN Batam kini telah berkembang menjadi   bright PLN Batam has developed into an IPP company
                  perusahaan IPP yang mengoperasikan pembangkit   that operates 500 MW capacity generator spread in
                  berkapasitas 500 MW tersebar di beberapa daerah di   several regions in Indonesia.               Corporate Social Responsibility
                  Indonesia.                                                                                         Tanggung Jawab Sosial Perusahaan



                  PT Pelayanan Listrik Nasional Batam         70              Laporan Tahunan | 2019 | Annual Report
   66   67   68   69   70   71   72   73   74   75   76