Page 69 - be'ah_Annual report 2019-Final2_Neat
P. 69
Construction and Demolition (C&D)
Construction and demolition (C&D) waste is for processing C&D waste and allocating several
one of the most voluminous waste generated. sites across the sultanate for the purpose.
Therefore, be’ah stressed on developing plans
Operational sites and 2020 planned sites
C&D sites: 21 Operational C&D sites: 4 Planned in
2020 goals
Al Dakhliyah (Nizwa, Samail, Bahla, Izki, Adam) Mirbat
Al Batinah (Barka, Al Rustaq, Saham, Sohar, Mudhaibi
Suwaiq, Khaboura, Musanah, Liwa, Shinas) Ibra
Al Sharqiya (AlKamil, Jalan bani bu Ali, Sur) Musandam
Al Dhahirah (Ibri)
Muscat (Al Amerat)
Buraimi
Dhofar ( Raysut )
Current Quantity of Construction and Demolition
Waste and Processed/Treated Quantities
Total C&D Waste at Facilities Total C&D Waste Processed in 2019
3955904.56 tonnes 754,747.20 tonnes
End of Life Tires (ELT)
End of Life Tires are tires that are no longer suitable developed management plan for ELT stream
for use on vehicles due to wear or damage. be’ah comprising of the collection and processing of ELT.
69