SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,L '22 2022- date Rly prog
B,DR 2023 portion of
242 34 11.03.53.19. 53 2019- LB- Sriramnagar~~Extension of Platforms by 130 mtrs RRSK 24935 3960 6923 10883 31/03/ Det. Est. 5 Work in progress. TDC - 31/03/2023 WIP
3.52.010 2020 1027 each at SRNR station. 2023 Sanc.
243 35 11.03.53.19. 53 2019- - Provision of Divyang facilities at halt station in HYB DF(1) 23875 3189 1756 4945 31/03/ RE under 11 Work In Progress. TDC 31/03/2023 WIP
prep.
4.52.001 2020 div ( PIL Compliance). 2023
244 36 11.03.53.19. 53 2019- - Provision of Train Indication Boards at DF(1) 9000 3943 1632 5575 31/03/ Det. Est. 90 Work In Progress. TDC 31/03/2023 WIP
4.52.002 2020 Sitaphalmandi, Arts college, Jamai osmania, 2023 Sanc.
Dabirpura MMTs stations.
245 37 11.03.53.19. 53 2019- - Extension of Platform no 1 to accommodate 24 RRSK 11273 16302 0 16302 31/03/ RE under 11 Work nearing Completion. TDC - 31/03/2023 WIP
prep.
4.52.003 2020 coaches at Malakpet Station. 2023
246 38 11.03.53.19. 53 2019- - 1.Provision of Passenger Announcement System DF(1) 17808 3006 0 3006 31/03/ Det. Est. 65 Supply portion completed. Outdoor and indoor WIP
4.52.004 2020 (PC Based) at 23 NSG Stations and GPS Digital 2023 Sanc. installation Work under progress. TDC. 31/03/2023.
clocks at 30 NSG Stations 2.Provision of standard LOA issued on 28.02.2020
signage
247 39 11.03.53.19. 53 2019- - Extension of Platform no 2 to accommodate 24 RRSK 15024 2299 5133 7432 31/03/ RE under 70 Work nearing Completion. TDC - 31/03/2023 WIP
4.52.005 2020 coaches at Malakpet Station. 2023 prep.
o
e
a
c
DF(1)
a
P
31/12/
h
s
0
(
l
i
s
t
f
o
N
.
f
1
C
D
3
.
e
T
1
0
2
WIP
2
1
/
/
2
s
t
o
t
O
e
y
l
e
a
e
e
b
r
0
2
1
.
1
0
L
B
-
2
1
3
2
5
1
.
.
3
0
.
3
5
o
f
o
n
N
o
0
2
4
2 248 40 11.03.53.21. 53 2021- LB- - Provision of 02 Nos of lifts (01 No. each at t D F ( 1 ) 0 0 0 0 0 0 3 1 / 1 2 / DE under 0 0 PO yet to be release. TDC 31/12/2022 2 W I P
8
P
4
r
s
i
i
o
v
r
p
prep.
p
.
e
3.52.001 2022 1057 Kamareddi station and Medchal station). 2022
249 41 11.03.53.21. 53 2021- - Development of trolley path and parcel terminal RRSK 24812 3488 6323 9811 31/03/ Det. Est. 0 Work in Progress. TDC 31/03/2023 WIP
Sanc.
4.52.001 2022 facilities at Kacheguda Yard 2023
250 42 11.03.53.21. 53 2021- - Bodhan~~Extension of Platform for 24 coaches at RRSK 16697 0 1537 1537 31/03/ Det. Est. 0 Work in Progress. TDC 31/03/2023 WIP
7.52.001 2022 Bodhan Railway Station 2023 Sanc.
251 43 11.03.53.21. 53 2021- - HYB Division: Raising of Platform & provision of RRSK 0 0 0 0 31/03/ DE under 0 Work being executed by RVNL. TDC 31/03/2023 WIP
prep.
7.52.002 2022 passenger amenities on PF no.2 at NSVP & PF no.1 2023
at BDVL railway station
252 44 11.03.53.22. 53 2022- LB- HYB Div: Kacheguda - Architectural, Financial & Cap. 7955 0 0 31/03/ Det. Est. 0 Work is in Progress. TDC 31/03/2024 WIP
Sanc.
3.52.001 2023 1076 DPR Consultancy for Major Up gradation of 2024
Kacheguda Railway Station in EPC Mode.
253 45 11.03.53.22. 53 2022- - HYB Div:-Provision of 10 Static Sale outlets of Cap. 5882 4539 4539 31/03/ Det. Est. 0 Detail Estimate Sanctioned EST
Sanc.
3.52.002 2023 OSOP at NSG2 to NSG5 Category stations (NSG2-1, 2023
NSG3-,1 NSG4-2, NSG5-6) at 10 stations
254 46 11.03.53.22. 53 2022- - HYB Division:-Provision of 53 Mobile Trolleys with Cap. 0 0 0 31/03/ DE under 0 Detailed Estimate Under Preparartion EST
prep.
3.52.003 2023 Back Packs of OSOP outlets at NSG2 to NSG5 & 2023
SG3 Category stations.at 49 stations
255 47 11.03.53.22. 53 2022- - HYB Div:- VDI and BABR - Development works at Cap. 0 0 0 31/03/ DE under 0 Detailed Estimate Under Preparation EST
7.52.001 2023 BABR and VDI Goods sheds 2024 prep.
256 48 11.03.53.22. 53 2022- - HYB:- DHP-Additional Approach Roach (CC Road) Cap. 0 0 0 31/03/ DE under 0 Tender Opened on 09/12/2022 and Tender TUF
7.52.002 2023 and Construction of Drain 2024 prep. Finalisation. TDC 31/03/2024