Page 158 - GM's Annual Inspection Booklet DEC- 2022
P. 158

5.  System Improvements by Mechanical (Power) Organization:

                   1)  NO SPAD Resolution Bell and Board provided at all lobbies.
                   2)  All LPs/ALPs are counselled to write pledge while signing on that “I will strictly
                       adhere to aspect of signal and i will not presume the aspect of the signals”.
                   3)  No crew should leave HQ  without prior permission during rest/PR. After return
                       from  leave/PR  declaration  is  being  obtaining  from  crew  that  they  have  availed
                       proper rest.
                   4)  Practical demonstration to ALPs on application of D1-Emergency when LP not
                       controlling train at danger signal is being carrying out by CLIs while conducting
                       Footplate inspection.

                   1)  Special focus is being done in counselling the staff on:
                         i.  Crew should not deviate from their driving duties.
                         ii.  They should follow Signal and only signal aspect and not to presume the
                            signals.
                        iii.  They  should  always  keep  their  train  well  under  control  according  to  the
                            signal aspect.
                        iv.  ALP  to  apply  emergency  brakes  without  hesitation,  in  case  LP  is  not
                            attentive or active in controlling the train according to the signal aspects and
                            when approaching Danger.

                   6.  Details of RCDs:

               RCDs: There is one RCD at KCG. It has got the facility to supply fuel in Diesel locos &
               Power cars in all platforms of KCG station. Earlier, there were  17fuelling  points  in  all
               05  platforms  in  KCG  Station. 4CCTV Cameras have been provided in RCD/KCG to
               ensure proper monitoring of activities and to avoid any irregularity.

                   a)  Storage facility:
                                                                             Avg.
                                                             Date of      issues per      Avg. no. of
                                 Tank         Storage
                  Depot                                    commissio     day (2022-     locos filled per
                                Number        capacity
                                                              ning           23)        day (2022-23)
                                                                            In KL
                                   1           70 KL       25.04.2008
                   KCG             2           70 KL       19.06.2008       90 KL             45
                                   3           250 KL      29.10.2009












                                                            156
   153   154   155   156   157   158   159   160   161   162   163