PLAN HEAD - 3200 ( BRIDGE WORKS )
          SN PH PROJECT  PH Y-o-S PB   Short Name of Work            Alloc.  Last Sanc  Exp. upto  Exp.   Exp.   Anti.   Est.   %age  REMARKS    Status
             SN ID             Item                                       Cost  March   during   upto   TDC of   Status  Phy.
                               (PB,LB,                                                                     prog
                               DRM)                                             '22   2022-  date  Rly     of Rly
                                                                                      2023      portion
          139 1 11.03.32.18. 32 2018- -  SC-DHNE:Proposed Rebuilding of existing STC   RRSK  24500  3103  0  3103  31/08/  Det. Est.   2  Site clearance is in progress for casting the thrust   WIP
                                                                                                     Sanc.
               4.52.001    2019    Br.No:756 at KM 617/200-300 between MJF-STPD                 2023          bed. Bridge No.757 & 756 are being executed by the
                                   as RCC Box due to Inadequate water way condition.                          same agency. After completion of Bridge No.757
                                                                                                              only the Bridge No.756 will be taken up due to site
                                                                                                              constraints. TDC 31/08/2023
          140 2 11.03.32.18. 32 2018- -  SC-DHNE Sec: Proposed Rebuilding of existing STC  RRSK  24500  11196  0  11196 31/03/  Det. Est.   92 Work completed, Protective works and S&T works   WIP
               4.52.002    2019    Br.No:757 at KM 617/300-400 between MJF-STPD                 2023  Sanc.   are in progress. TDC:31/03/2023
                                   as RCC Box due to Inadequate water way condition.
          141 3 11.03.32.20. 32 2020- LB-  HYB Division : SC-DHNE Section :- Prov. of Side   RRSK  38335  0  1430  1430  31/05/  Det. Est.   10 Work awarded on 07-07-2022. TDC:31-05-2023.  WIP
               1.52.001    2021 523 Pathway for Bridge No.398 @ 181/350-182/300                 2023  Sanc.
                                   Sriramnagar-Gwd Stations and Bridge No. 442 @
                                   240/800.
          142 4 11.03.32.21. 32 2021- LB-  SC-DHNE Section: Replacement of existing Steel   RRSK  0  0  0  0  31/05/  DE under   0  Newly sanctioned work (Feb'22).    WIP
                                                        4
                                                         ,
                                                         B

                                                       1
                                                      O
                                                 o
                                                  n
                                                b



                                                     N
                                                   B
                                                    r

                                                                r
                                                               B
                                                                 N
                                                                                                              GAD is under preparation. TDC:31-05-2023.
                                                                                                2023
                                                                  o
                                                               ,
                                                           N

                                                          r
                                                            o
                                                              6
                                                             2

                               5
                                3
                            2
                             2
                                    i
                                    r
                                6
                                   G
                           0
                 5
                 2
               1 1.52.001 1  2022 536 Girders with PSC Slab on Br NO 14,Br No 26,Br No          2 0 2 3  prep.  G A D   i s   u n d e r   p r e p a r a t i o n .   T D C : 3 1 - 0 5 - 2 0 2 3 .
                .