Page 383 - GM's Annual Inspection Booklet DEC- 2022
P. 383

SN PH PROJECT  PH Y-o-S PB   Short Name of Work            Alloc.  Last Sanc  Exp. upto  Exp.   Exp.   Anti.   Est.   %age  REMARKS    Status
             SN ID             Item                                       Cost  March   during   upto   TDC of  Status  Phy.
                               (PB,L                                            '22   2022-  date  Rly     prog
                               B,DR                                                   2023      portion     of
          179 8 11.03.42.19. 42 2019- LB-  MLY -  Installation and commissioning of   Cap.  21514  0  0  0  31/03/  Det. Est.   0  P.O placed by COFMOW on M/s Oriental enterprises.  WIP
               3.52.003    2020 711 Automatic Coach washing plant at  ECS/MLY                   2023  Sanc.   M/s Oriental has agreed to provide a plant suitable
                                                                                                              for both stocks. Letter is written to firm for
                                                                                                              submission of GAD and CME/PLG office to remaind
                                                                                                              the firm.
          180 9 11.03.42.19. 42 2019- LB-  Hyderabad Division -ECS/MLY: Creation of   Cap.  0  0  176  176  31/03/  DE under   The competent authority has accorded sanction to   WIP
                                                                                                     prep.
               3.52.004    2020 713 Maintenance facilities for homing of three phase            2023          the Detailed estimate for the subject work
                                   EMUs  under MMTS phase-II                                                  amounting to Rs. 1,96,20,665/- as below. i) M&P and
                                                                                                              T&P cost Rs. 1,68,02,796.00 ii) Civil Engg. cost Rs.
                                                                                                              15,16,885.00 iii) Electrical (G) cost Rs. 8,01,003.00 iv)
                                                                                                              S&T cost Rs. 4,99,981.00 Total Rs. 1,96,20,665.00
                                                                                                              Out of 38 items of M&P and T&P, 21 indents were
                                                                                                              placed by stores for which 9 PO was released and 3
                                                                                                              items of material were received and 9 indents are
                                                                                                              under process.
          181 10 11.03.42.21. 42 2021- LB-  Provision of OHE line at  CWS/LGDS  Cap.  0  0  4965  4965  31/03/  DE under   0  Detailed Estimate Under Preparation.  EST
                                                                                                     prep.
               3.52.001    2022 687                                                             2023
          182 11 11.03.42.21. 42 2021- LB-  Hyderabad~~Improvements/Repairs/renovations  Cap.,D 24069  0  0  0  31/03/  Det. Est.   0  Work is in Progress. TDC 31/03/2023  WIP
                                                                                                     Sanc.
               3.52.002    2022 728 of roofs, , drainages, sheds, roads and toilets in S&T RF   2023
                                   workshops, Mettuguda
          183 12 11.03.42.21. 42 2021- -  CWS/LGD - Flooring at Tracks besides DHMU shed  Cap.  0  0  0  0  31/03/  DE under   0  Detailed Estimate is under finance vetting.   EST
                                                                                                     prep.
               4.52.001    2022    150M X 9.70M                                                 2023
          184 13 11.03.42.21. 42 2021- -  DLS/MLY - Provision of OHE arrangements for   Cap.  0  0  0  0  31/03/  DE under   0  Detailed Estimate Under Preparation. TDC   EST
               4.52.002    2022    DEMU Pit line-1 at Diesel Loco Shed, Moula-ali.              2023  prep.   31/03/2023
          185 14 11.03.42.21. 42 2021- -  Renovation of Old LR bays, Drainage System,   RRSK  6383  0  0  0  31/03/  Det. Est.   0  Tender Awarded. Work to be Started. TDC   WIP
                                                                                                     Sanc.
               4.52.003    2022    Flooring and Service Building with miscellaneous             2023          31/03/2023
                                   works at Diesel Loco shed , Moula-Ali
          186 15 11.03.42.22. 42 2022- -  HYB Division-Development of infrastructure    Cap.  0  0  0  31/03/  DE under   0  Detailed estimate is under preparation  EST
                                                                                                     prep.
               4.52.001    2023    facilities for maintenance of Vande Bharat Train at          2023
                                   pit line  no.3 at kacheguda depot.
          187 16 11.03.42.22. 42 2022-  KCG depot : Provision of 750 V power supply for   Cap.  0  0  0  0    Detailed estimate is under preparation  EST
               3.52.001    2023    maintenance of HOG coaches
   378   379   380   381   382   383   384   385   386   387   388