Page 79 - GM's Annual Inspection Booklet DEC- 2022
P. 79

OPERATING


            A.  COACHING

                a) PUNCTUALITY:
                                                                                     th
                   The punctuality performance of Express Group trains (Upto 30  -22) is 93.07%.

                b) TRAFFIC BLOCKS:
                   10224 hours of traffic Blocks were offered in 2022-23 as against 10490 hours of last
                                  th
                   year  (upto  30   Nov)  for  Maintenance/  TWR/  elimination  of  LC  gates  and  Machine
                   works.

            B.  FREIGHT

                i. LOADING:
                                                      th
                 During  the  current  year  (Upto  30   Nov)  the  division  has  achieved  1.052  MTs  (596.5
                 rakes) as against the loading of 0.995 MT (547.5 rakes) done in 2021-22, which is more
                 by 5.8% over last year.

                                                                           th
                 Revenue Loading: During the current year (upto 30  Nov) the division has achieved
                 Revenue loading of 0.971 MTs (485 rakes) as against the revenue loading of 0.911 MTs
                 (474.5 rakes) done in 2021-22, which is more by 6.6% over Last year.

                   a)  Food  Grains:  Food  Grains  loading  achieved  in  current  year  is  0.786MTs  (285
                      rakes) as against 0.748 MTs (285.5) in 2021-22, which is more by 5.1% over last
                      year and as against the target of 0.764 MTs, which is more by 2.9% over target.
                   b)  Containers: Containers loading achieved in current year, is 0.174 MTs (195 rakes)
                      as against 0.130MTs (178 rakes) loaded in 2021-22, which is more by 33.4% over
                      Last  year and  as against  the  target  of  0.174  MTs,  which  is more  by  13.6%  over
                      target.

                ii. UN-LOADING:

                   912  Rakes  were  unloaded  in  2022-23  as  against  814  Rakes  done  in  2021-22  (upto
                   30th Nov).

            New Traffic & Terminal:

                                      st
                 New Terminal: 1  time Fertilizer rake unloaded at newly opened Gajwel (GJWL) on
                   27.06.2022.
                                      st
                 New Terminal: 1  time Fertilizer rake unloaded at newly opened Medak (MDAK) on
                   02.08.2022.
                                         st
                 New Commodity: 1  time Iron/Steel sheets rake unloaded at Alampur Road (ALPR)
                   on 02.08.2022.
                                         st
                 New Commodity: 1  time Iron ore pellets rake unloaded at Balanagar (BABR) on
                   21.08.2022.


            INTER CHANGE:
                                                                        th
                 The interchange performance in 2022-23 (upto 30  Nov) is 10108 trains dealt whereas
                   8079 trains handled in 2021-22, which is increased by 25.1 % (2029 trains).