Page 41 - CRS Booklet DEC-2022
P. 41
09. USFD progress. (Nov’2022)
Sl. No. Items / Routes B
1 Total length to be tested/ Month 299
2 Total yearly work load 3593
A RAIL 1936
a Cumulative target upto the month 1290.7
b Progress during the month 147
c Total progress up to the month 1332
B Bridge 71
a Cumulative target upto the month 47
b Progress during the month 0
c Total progress up to the month 71
C High banks and cuttings 132
a Cumulative target upto the month 88
b Progress during the month 8
c Total progress up to the month 14
D Curves 33
a Cumulative target upto the month 22
b Progress during the month 4
c Total progress up to the month 27.5
5 Point &Xings, SEJ's and scabs 309
a Cumulative target upto the month 206
b Progress during the month 5
c Total progress up to the month 82.5
E WELDS(AT/SKV+FBW) 1112
a Cumulative target upto the month 741
b Progress during the month 64.5
c Total progress up to the month 441
3 Total (A+B+C+D+E) 3593
a Cumulative target upto the month 2395
b Progress during the month 228.5
c Cumulative Progress upto the month 1968.0
39