 CONTROL GATES & BARRAGES OF BAHR AL-BAQAR DRAIN







 PROJECT DETAILS  PROJECT OVERVIEW:
 Location: Suez, Egypt  The Construction of Control Gates & Barrages of Bahr Al-Baqar Drain project in Egypt, led by EDECS, entails the

 Name of Client: Ministry of Water Resources and Irrigation  construction of 3 wastewater regulating penstock stations designed to manage a flow of 5 million m³/day. These
 Role in Contract: Main Contractor  stations, featuring double steel gates and maintenance cranes, are strategically located along the Bahr Al-Baqar
            Drain. Components include the Cross Regulator Penstock station on the old Drain 7,500 m  of reinforced concrete for
                                                                                         3
                                                            3
 SCOPE OF WORK  7 vents, the Intake Regulator Penstock station 3,500 m  of reinforced concrete for 4 vents, and the Cross Regulator
            Penstock station with a weir on the New Drain 6,200 m  of reinforced concrete for 5 vents.
                                                           3
 Consultant Name: ENOIA Utilities Consulting Engineers and ACE Moharram-Bakhoum
 Water Irrigation &
 Contract Duration: 12 Months
 Earthworks
 Project Type: Water Irrigation