PROJECT DETAILS PROJECT OVERVIEW:
Location: Suez, Egypt The Construction of Control Gates & Barrages of Bahr Al-Baqar Drain project in Egypt, led by EDECS, entails the
Name of Client: Ministry of Water Resources and Irrigation construction of 3 wastewater regulating penstock stations designed to manage a flow of 5 million m³/day. These
Role in Contract: Main Contractor stations, featuring double steel gates and maintenance cranes, are strategically located along the Bahr Al-Baqar
Drain. Components include the Cross Regulator Penstock station on the old Drain 7,500 m of reinforced concrete for
3
3
SCOPE OF WORK 7 vents, the Intake Regulator Penstock station 3,500 m of reinforced concrete for 4 vents, and the Cross Regulator
Penstock station with a weir on the New Drain 6,200 m of reinforced concrete for 5 vents.
3
Consultant Name: ENOIA Utilities Consulting Engineers and ACE Moharram-Bakhoum
Water Irrigation &
Contract Duration: 12 Months
Earthworks
Project Type: Water Irrigation